About our kitchen renovations service
The kitchen is where most families spend their time, and where a renovation adds the most value to a home. We handle the full project: layout, cabinets, counters, plumbing, electrical, lighting, flooring and appliance install.
Want to open the kitchen to the living room? Removing a wall often means adding a beam, which needs an engineer and a permit. We look after that as part of our whole-home renovation work. For the finishing touches in the rest of the house, see our bathroom renovations.
Before and after
The same kitchen before and after: dark cabinets, granite and a peninsula replaced with white shaker cabinets, a quartz waterfall island and vinyl plank flooring.
What's included
What we do
- Full kitchen renovation
- Kitchen design and 3D layouts
- Custom cabinetry
- Cabinet refacing and painting
- Countertops (quartz, granite, marble, laminate)
- Backsplash tile
- Kitchen islands
- Open-concept conversion (wall removal)
- Appliance installation
- Sink, faucet and plumbing relocation
- Kitchen lighting (pot lights, under-cabinet, pendants)
- Pantry and storage solutions
How your project runs
Site visit
We look at the space, talk through your goals and check zoning and permit needs.
Drawings and estimate
You get a written, itemized estimate and a schedule. We prepare drawings and permits.
Build
One project manager runs the trades and keeps you updated each week.
Inspect and hand over
We book every inspection and walk you through the finished work.
What a full kitchen renovation includes
A full kitchen renovation replaces everything from the subfloor up: cabinets, counters, backsplash, flooring, lighting, plumbing fixtures and the wiring behind them. We take the room back to the studs where the walls are in poor shape, which lets us add circuits, fix old plumbing and insulate an exterior wall while it is open.
Before any design work, we check what the room is hiding. Older homes in Hamilton, Kitchener and Cambridge often hide undersized wiring, galvanized or cast iron drains, a range hood that vents into the attic, or a 100 A electrical panel with no room for new circuits. Finding these early means they go into the first quote instead of showing up as change orders in week three.
A typical full kitchen involves seven or eight trades: demolition, framing, plumbing, electrical, HVAC for the hood duct, drywall, tile, cabinet install, stone fabrication and paint. Our job is to run them in the right order, book inspections at the right moments and keep the site clean between them.
Kitchen layouts that work: galley, L-shape, U-shape and islands
The right layout depends on the room's shape, where the windows and doors fall, and how many people cook at once. Moving the sink or range costs more than keeping them in place, so we start by asking whether the current layout has a real problem or only tired finishes.
- Galley: two parallel runs. Very efficient for one cook. Leave at least 1,000 mm (about 40 in) between counters, and closer to 1,200 mm (48 in) if two people work in it.
- L-shape: counters on two adjoining walls. Common in Hamilton semis and Brampton townhouses. Works well with a small island or table in the open corner.
- U-shape: counters on three walls. The most storage and counter space, but the two inside corners need blind-corner pull-outs or the space is wasted.
- Island or peninsula: adds prep space and seating. An island needs about 1,050 to 1,200 mm (42 to 48 in) of clear aisle on every working side. Seating needs a 300 mm (12 in) counter overhang and about 600 mm (24 in) of width per stool.
Keep the sink, range and fridge within a few steps of each other, with landing space beside each one. A 450 mm (18 in) landing area on at least one side of the range and fridge is a sensible minimum. In a narrow semi or an older Hamilton row house, a peninsula often fits where a full island would choke the aisles.
Tip: Tape the island footprint on your current floor and live with it for a week. If you keep bumping the tape, the island is too big.
After
Kitchen cabinets and countertops compared
Cabinets take the largest share of most kitchen budgets, so it pays to know what you are buying. The box matters more than the door. Plywood boxes hold screws better and tolerate a small leak under the sink better than particleboard. Good-quality melamine on particleboard is fine for upper cabinets and budget projects.
| Cabinet option | What you get | Lead time |
|---|---|---|
| Stock (flat-pack or in-store) | Fixed sizes in 75 mm (3 in) steps, fillers to fit the room, limited finishes | Days to 2 weeks |
| Semi-custom | Standard boxes with more sizes, finishes and inserts | 3 to 6 weeks |
| Custom | Built to the millimetre, any finish, full-height and specialty units | 4 to 6 weeks, longer for specialty finishes |
| Refacing | New doors, drawer fronts and veneer on your existing boxes | 2 to 4 weeks |
For doors, painted MDF gives a smooth, stable finish and resists the cracking that solid wood shows at joints. Thermofoil is cheaper but can peel near a hot oven. High-gloss lacquer looks sharp but shows fingerprints. Refacing only makes sense when the boxes are solid and the layout already works.
Countertops come down to maintenance, heat and budget:
- Quartz: non-porous, no sealing, consistent colour. Can scorch under a hot pot, so use trivets.
- Granite: handles heat well, each slab is unique. Needs sealing every year or two depending on the stone.
- Marble: beautiful and cool for baking, but it etches from lemon juice and wine. Choose it knowing it will patina.
- Porcelain slab: thin, heat and stain resistant, and good for full-height backsplashes. Chips at the edges if struck hard.
- Laminate: the lowest cost and much better looking than it used to be. Seams and undermount sinks are its weak points.
Flooring, backsplash and lighting choices
Kitchen flooring has to handle water, dropped pans and heavy traffic. Porcelain tile is the toughest option and pairs well with in-floor heat, though it is hard on dropped dishes. Engineered hardwood looks warm and can run continuously into an open living room, but standing water at the dishwasher will damage it. Luxury vinyl plank is waterproof, quiet and forgiving, and it suits busy families and rental units.
Lay new flooring before the cabinets or after them? We usually install tile or engineered wood under the full cabinet footprint so a future layout change does not leave a hole in the floor. Floating vinyl floors are the exception, since they must be able to move and should stop at the cabinet base.
For the backsplash, ceramic and porcelain tile are easy to clean and cost the least to install. A slab backsplash that matches the counter removes grout lines entirely. Bring the backsplash up to the underside of the upper cabinets or the hood, and plan outlet locations so they don't land in the middle of a feature tile.
Good kitchen lighting comes in three layers. Pot lights give general light, under-cabinet LED strips light the counters where you actually work, and pendants over the island add focus. Put each layer on its own switch or dimmer.
Before
Kitchen renovation cost in Hamilton, Brampton and Kitchener-Waterloo
Most kitchen renovations in Hamilton, Brampton, Kitchener and Cambridge in 2026 fall into three broad bands. These are typical ranges, not quotes. Your price depends on the room's size, the finishes you choose and what we find once the walls are open. We give you an exact price after a site visit.
| Scope | What is included | Typical range (CAD, before HST) |
|---|---|---|
| Refresh | Refaced or painted cabinets, new counters, backsplash, fixtures; same layout | $15,000 to $30,000 |
| Full renovation, same layout | New semi-custom cabinets, quartz or granite, flooring, lighting, plumbing and electrical updates | $30,000 to $65,000 |
| Full renovation with layout changes | Custom cabinets, moved plumbing, island, wall removal or high-end finishes | $65,000 to $110,000+ |
Published Ontario figures put semi-custom cabinets at roughly $200 to $400 per linear foot and custom cabinets at $500 to $1,200 per linear foot. Installed quartz typically runs $55 to $150 per sq ft and granite $45 to $130 per sq ft, before edge profiles and sink cut-outs. Removing a load-bearing wall to open the kitchen commonly adds $5,000 to $15,000 in Hamilton and Kitchener-Waterloo, and long spans that need new footings can reach $18,000 to $30,000 or more.
The biggest cost drivers are moving the sink or gas line, the cabinet grade, structural work, an electrical panel upgrade, and appliance packages that need new dedicated circuits or a larger hood duct.
Do you need a permit for a kitchen renovation in Ontario?
A kitchen renovation needs a building permit when it changes structure or plumbing, and it almost always needs an ESA electrical notification. Replacing cabinets, counters and fixtures in the same locations usually needs no building permit. Each city keeps its own list, and Hamilton's is the strictest of the four we work in, so we confirm with the building department before work starts.
- Hamilton, including Stoney Creek: the City of Hamilton's building permit page lists adding or removing any wall, load-bearing or not, new or relocated plumbing, and installing or replacing drywall and insulation as permit work. Cabinetry, flooring and replacing fixtures in the same location do not need one.
- Kitchener: the city's when you need a building permit page lists removing a load-bearing wall and adding or moving plumbing fixtures as permit work. Cabinets, countertops, tile, a sink swapped in the same spot and removing a non-load-bearing wall in a house do not need one.
- Cambridge: the city's building permits page lists adding or removing walls, interior structural alterations and plumbing or drains as needing a permit. Kitchen cupboards without plumbing do not.
- Brampton: the city's when a permit is not required page says new kitchen cupboards need no permit if the plumbing doesn't change. Structural changes and plumbing work do need one.
- Exhaust: a new or relocated range hood duct through an outside wall may need a permit, depending on the city and the work around it.
- Electrical: almost all electrical work needs a notification filed with the Electrical Safety Authority before it starts. A building permit does not replace it.
- Gas: moving a gas line or connecting a gas range must be done by a certified gas technician working for a TSSA-registered contractor.
In Ontario, anyone you hire to do electrical work must be a Licensed Electrical Contractor. The person doing the work files the notification, and ESA issues a Certificate of Acceptance when the work passes. Ask for a copy, because insurers and buyers may want it. ESA explains this on its hire a licensed contractor page.
Permit fees for a kitchen are small next to the project. Kitchener, for example, lists a $95 fee to remove a load-bearing wall plus a $250 deposit refunded once the final inspection passes, and Hamilton's minimum permit fee is $291. Our drawings and permits service handles the building side, and our guide to building permits in Hamilton, Brampton, Kitchener and Cambridge covers each city in more depth.
After
Our kitchen renovation process, step by step
- Site visit and measure. We measure the room, open the sink base and check the panel, the hood duct route and the floor structure. You tell us how you cook and what bothers you about the current kitchen.
- Layout and quote. We draw the layout, agree on cabinet grade and finishes, and give you a written, itemized price.
- Selections and ordering. You pick cabinets, counters, tile, fixtures and appliances. We order cabinets first because they have the longest lead time, and we need final appliance specs before the cabinet drawings are signed off.
- Permits. If walls or plumbing move, we prepare drawings and apply. Work starts once the permit is issued.
- Demolition and rough-in. We protect the rest of the house, remove the old kitchen, then run new plumbing, wiring and ductwork. Inspections happen before the walls close.
- Drywall, floor and paint. Walls are patched or replaced, the floor goes down and the room gets its first coats of paint.
- Cabinets, template and counters. Cabinets go in and are levelled. The stone shop templates the counters on site, then fabricates and installs them, usually 1 to 2 weeks later.
- Backsplash, fixtures and appliances. Tile, sink, faucet, lighting and appliances go in, followed by final inspections, touch-ups and a walkthrough with you.
Kitchen renovation timeline
Plan on two to four months from first meeting to finished kitchen, with 4 to 8 weeks of that on site. The time before demolition is where most delays start, so we lock decisions early.
| Stage | Typical duration |
|---|---|
| Design, selections and quote | 2 to 4 weeks |
| Building permit, if needed | 2 to 6 weeks, varies by city and completeness of the application |
| Cabinet fabrication | 4 to 6 weeks for most custom work, running alongside permits |
| Demolition and rough-in | 1 to 2 weeks |
| Drywall, flooring, cabinets | 1 to 3 weeks |
| Counter template to install | 1 to 2 weeks |
| Backsplash, fixtures, final details | 1 week |
The usual causes of delay are late appliance choices, a back-ordered faucet or tile, hidden problems behind the walls and a permit application that needs revisions. A kitchen renovation timeline also stretches if you change the layout after cabinets are ordered.
Living through a kitchen renovation
You will be without a working kitchen for most of the on-site period, so set up a temporary one before demolition day. A corner of the dining room or basement with the fridge, a microwave, a kettle, a toaster oven and a plastic bin for dishes covers most meals. An induction hot plate helps if you cook every night.
We seal the work area with plastic dust walls and a zippered door, cover the floors on the route in and out, and close or filter the heating and air return vents near the kitchen. Change your furnace filter when the work ends, because fine drywall dust always gets somewhere.
Before we start, empty the cabinets completely, plan where packages and deliveries will go, and tell your neighbours if parking or noise will affect them. Water and power will be off for short periods during rough-in, and we give you notice the day before.
How to choose a kitchen contractor in Hamilton and the surrounding area
Compare quotes on the same written scope, or you are comparing different kitchens. Ask each contractor these questions:
- Is the quote itemized, and which allowances (tile, fixtures, lighting) are included and at what amounts?
- Who applies for the building permit and who files the ESA notification? Will I get the Certificate of Acceptance?
- Who does the electrical work, and are they a Licensed Electrical Contractor?
- Can you give me a current WSIB clearance certificate? The WSIB clearance FAQ explains what it shows.
- What is the payment schedule, and is each payment tied to a finished stage of work?
- How are change orders priced and approved?
- Who is on site every day, and who do I call with a question?
- What warranty do you give on your workmanship, and is it in writing? Ours is 2 years.
Be wary of a large deposit before anything is ordered, a price with no written scope, or a contractor who suggests skipping the permit to save time. Unpermitted structural or plumbing work can cause trouble with insurers and buyers later.
Kitchens often grow into bigger projects. If the wall you want to remove is part of a wider layout change, see our whole-home renovation service. If the panel needs an upgrade or the hood needs a new duct run, our plumbing, electrical and HVAC team takes care of it. For a condo kitchen, where board approval and elevator bookings shape the schedule, see condo renovations. Our kitchen renovation guide goes deeper on costs, layouts and timeline, and you can request a free quote when you are ready.
Kitchen renovations: common questions
How long does a kitchen renovation take?
Most full kitchen renovations take 4 to 8 weeks on site. Custom cabinets can take 4 to 6 weeks to make, so we order them early to keep the schedule tight.
Can I keep using my kitchen during the renovation?
Not during a full renovation. We can set up a temporary kitchen area with your fridge and microwave so you can still make simple meals.
Do I need a permit to remove a kitchen wall?
If the wall is load-bearing, yes. A permit is needed for structural changes, and usually for new plumbing too. We check the wall, arrange the engineering and apply for the permit.
Is refacing cabinets cheaper than replacing them?
Usually, by a good margin, because the boxes, plumbing and counters can stay. Refacing only makes sense if the boxes are solid and you like the current layout.
Should I choose quartz or granite for my kitchen counters?
Quartz needs no sealing and gives a consistent look. Granite handles heat better and needs sealing every year or two. Both cost about the same in Hamilton and Kitchener-Waterloo, so it comes down to looks and maintenance.
Can you move my sink to an island?
Often, yes. The drain needs proper slope and venting, which may mean opening the floor or the ceiling below. Moving a sink needs a permit in Hamilton, Brampton, Kitchener and Cambridge.
Do I need an ESA permit for new kitchen lighting and outlets?
Yes. Almost all electrical work in Ontario needs a notification filed with the Electrical Safety Authority before it starts. The person doing the work files it, and you should get a copy of the Certificate of Acceptance at the end.
Will my electrical panel handle a new kitchen?
Many older Hamilton-area homes have 100 A panels with no spare space. Induction ranges, wall ovens and other new appliances often need dedicated circuits, so we check the panel at the first visit and price any service upgrade up front.
When should I choose my appliances?
Before the cabinet drawings are finalized. Cabinet sizes, the hood duct and electrical circuits all depend on the exact appliance models.
Does my range hood need to vent outside?
We recommend ducting the hood outside whenever the route allows, since recirculating hoods only filter grease. A new or relocated exhaust duct may need a permit, depending on your city.
Helpful resources
Official guidance we follow on every kitchen renovations project:
- Building permit requirements in Hamilton — City of Hamilton
- Hire a licensed electrical contractor — Electrical Safety Authority