Rendering of completed home
Serving Hamilton, Stoney Creek, Brampton, Kitchener and Cambridge
Renovations, legal basements and custom homes in Hamilton
From the first drawing to the final inspection, The Smart Renovations Inc. plans, permits and builds your project with one team you can reach.
- 2-year workmanship warranty
- Serving Ontario homeowners since 2020
- Permits handled for you
Our services
Everything your home needs, under one roof
We handle the whole project ourselves: design, permits, structure, trades and finishing. Choose a service to see exactly what is included.
-
Rendering of completed home
-
Basements
Legal basement apartments
Secondary suites with permits, fire separation and separate entrances, ready to rent.
-
Basements
Basement finishing
Rec rooms, theatres, gyms, bathrooms and laundry rooms for your family.
-
-
After
Kitchens and bathrooms
Kitchen renovations
Custom cabinets, counters, islands and open-concept layouts.
-
-
-
-
-
Trades and systems
Plumbing, electrical and HVAC
Rewiring, panel upgrades, EV chargers, heat pumps and insulation.
-
-
Legal basement apartments
Turn your basement into a legal rental unit
Ontario allows second units in many houses, but a legal unit has to meet the Building Code, the Fire Code and your city's zoning. We handle all of it:
- Zoning check, drawings and the building permit
- Fire separation and interconnected smoke and CO alarms
- Separate entrance and egress windows
- Underpinning if you need more ceiling height
- Final inspections, so the unit is ready to rent
How we work
A clear process from quote to keys
Free consultation
We visit your home, listen to what you want and look at what is possible.
Design and estimate
You get drawings and a written, itemized estimate with a schedule.
Permits
We apply for the permits and answer the city's questions. How permits work.
Build and inspect
One project manager runs every trade and books every inspection until handover.
Recent projects
Work we are proud of
-
After
Kitchen renovation, before and after
A dated kitchen with dark cabinets, granite counters and a peninsula, rebuilt with white shaker cabinets, a quartz waterfall island, wall ovens, a wine fridge and vinyl plank flooring.
-
Rendering of completed home
Modern three-storey custom home
A three-storey infill home with white stucco, cedar cladding, black-framed windows and a two-car garage. The finished exterior shown here is a rendering.
-
Bathrooms with soaker tub and glass showers
Deep soaker tub, frameless glass showers with lit niches, floating double vanities with LED lighting and large-format tile, shown finished and during tiling.
Areas we serve
Working across Hamilton, Brampton, Kitchener and Cambridge
Our office is in Hamilton, and we have served homeowners in these cities since 2020.
We take on renovations, basements and new builds in these cities and the neighbourhoods around them.
- Hamilton
- Stoney Creek
- Brampton
- Kitchener
- Cambridge
Get in touch
Talk to our team
Call (647) 779-5974, Monday to Friday, 7 a.m. to 5 p.m., or send us your project details. Every project comes with our 2-year workmanship warranty.
Why plan the whole project with one team
Most renovation problems happen at the hand-offs. The designer draws something the engineer has to change, the city sends back comments nobody owns, and the trades show up in the wrong order. When one team handles design, permits and construction, each decision is made once, by the people who will build it.
It also changes how you plan. We price the layout against real construction costs while the drawings develop, so you learn that an idea is over budget while it is still cheap to change. When the plans examiner asks for a revision, the people who drew the plans answer it. When an inspector flags something, the crew that built it fixes it.
For you, it means one contract, one schedule and one person to call. See how our drawings, engineering and permit service fits into a build, or ask for a free quote to start the conversation.
After
What a renovation in Hamilton and the surrounding area usually involves
Most renovations that go beyond new finishes need a building permit. Removing or moving walls, adding a bathroom, finishing a basement or adding a unit all start with drawings and a permit application to your city. Applications are now reviewed under the 2024 edition of Ontario's Building Code, which took effect on January 1, 2025.
Once work starts, a city inspector checks it at set stages, such as excavation and footings, framing, plumbing, insulation before drywall, and the final inspection. Electrical work gets its own permit and inspection from the Electrical Safety Authority (ESA). Your contractor books each inspection, and the city must carry it out within two working days of the request.
The age of the house shapes the job. Older houses in established neighbourhoods often hide knob-and-tube wiring, galvanized or cast-iron pipes, lath and plaster, and materials that may contain asbestos. We test suspect materials before demolition and price likely upgrades in the estimate, so they don't arrive later as surprises.
Basements are the other big factor. Many older basements are under 2 m high and take on water where the wall meets the floor. Fixing drainage and lowering the floor with underpinning or a bench footing is often the real first step of a basement renovation. Our guide to building permits in Hamilton, Brampton, Kitchener and Cambridge covers the approval side in detail.
How to choose a renovation contractor in Ontario
Before you sign with anyone, ask these questions and get the answers in writing. A good contractor will answer all of them without hesitation.
- Can you show me a WSIB clearance certificate? A clearance shows the business is registered with the Workplace Safety and Insurance Board and up to date. You aren't legally required to get one for renovations to the home you live in, but asking is a quick check that the contractor covers its workers. The WSIB clearance page explains how it works.
- What liability insurance do you carry? Ask for a certificate showing the insurer and the policy dates. If anything looks unclear, call the insurer.
- Who does the electrical work? In Ontario, electrical work done for hire must be done by a Licensed Electrical Contractor. You can check a licence through the ESA's guide to hiring a licensed contractor.
- Who gets the permit? Your contractor should prepare the drawings, apply and book inspections. Walk away from anyone who suggests skipping a permit to save time.
- Is the full scope in a written contract? Materials, allowances, schedule, price and the process for changes should all be written down. A line that just says "finish basement" leads to disputes.
- How is the payment schedule set? Payments should follow completed stages, such as framing inspected or drywall finished. Be wary of a large payment before any work is done.
- Building a new home? The builder must be licensed by the Home Construction Regulatory Authority (HCRA) and enrol the home with Tarion before construction starts.
Compare quotes on the same scope. A low price that leaves out permits, engineering or disposal will grow once the job starts.
What affects renovation cost in Hamilton, Brampton, Kitchener and Cambridge
Size and finishes matter, but the biggest swings come from what is behind the walls and under the floor. Moving plumbing, removing a load-bearing wall, upgrading the electrical service or lowering a basement each adds engineering, permits and trades. Two kitchens of the same size can differ by tens of thousands of dollars because one keeps the layout and the other moves the sink and opens a wall.
Site conditions add more. Narrow lots with no side access mean hand-digging and carrying materials, and older houses need more work to meet today's code. A realistic budget also includes permit fees, engineering, 13% HST and a contingency of 10 to 15%, or more for an older house.
| Project | Typical range in southern Ontario (2026) |
|---|---|
| Full bathroom renovation | $20,000 to $50,000 |
| Kitchen renovation | $35,000 to $90,000 or more |
| Basement finishing | $50 to $100 per sq ft |
| Legal basement apartment (enough ceiling height) | $80,000 to $150,000 or more |
| Underpinning to lower a basement | Adds about $40,000 to $100,000 or more |
These are broad ranges that vary with size, finishes and site conditions. You get an exact, itemized price after a site visit. Our guides to basement finishing cost and kitchen renovation costs and timelines break the numbers down further.
Renovating for rental income: second units and multiplexes
Ontario lets many urban residential lots have up to three units without a rezoning: three units in the house, or two in the house and one in a separate building such as a garden or laneway suite. Kitchener goes further and permits up to four dwelling units on residential lots, and Hamilton allows up to four in some zones. Each city sets its own zoning standards, so setbacks, entrance locations and parking differ from one city to the next.
A legal unit must meet the Building Code and the Fire Code. That means fire separations between units, interconnected smoke and carbon monoxide alarms, a safe way out of every bedroom, enough ceiling height, and heating ducts that don't carry smoke from one unit to another. Brampton also requires additional residential units to be registered with the city. The province's rules exempt a second unit in an existing house from development charges, but Hamilton notes that an additional dwelling unit may be subject to parkland and development charges, so we confirm fees with the city before you commit.
Work out the numbers before you design. Underpinning, a walk-out entrance and a bigger electrical service can each be large line items, so we check zoning and price them first. If you are weighing a legal basement apartment against a garden suite or a multiplex rebuild, we can price both. Read our guide to making a basement apartment legal in Ontario and the province's guide to adding a second unit.
Planning your renovation timeline by season
In Ontario the calendar affects both approvals and construction. Design and permits take weeks to months, so the time to plan a spring or summer build is the fall or winter before.
- Winter (December to March): Good for interior work such as kitchens, bathrooms and basements, and for finishing drawings and permit applications. Excavation and concrete are possible, but frozen ground and heating or blanketing fresh concrete add cost.
- Spring (April to June): Excavation, underpinning, foundations and additions start as the frost leaves the ground. Leaks show up during the spring thaw, which makes it a good time to find where water gets in.
- Summer (July and August): Peak season for roofing, siding, decks, fences and interlock. Trades and materials book up, so confirm dates early.
- Fall (September to November): Close in exterior work before freeze-up and pour footings while the ground is workable. Footings must sit below the frost line, typically at least 1.2 m (4 ft) below grade in this part of Ontario.
Approvals set the start date. Ontario requires cities to decide on a complete permit application for a house within 10 business days, but a minor variance through the Committee of Adjustment can add months. We build approval time into your written schedule.
Renovation contractor for Hamilton, Brampton, Kitchener and Cambridge
We are based in Hamilton and work across Hamilton (including Stoney Creek), Brampton, Kitchener and Cambridge. Stoney Creek is part of the City of Hamilton, so its permits come from the City of Hamilton. Kitchener and Cambridge are in the Region of Waterloo but each issues its own building permits, and Brampton is in Peel Region. The housing ranges from older brick houses near the original downtowns to newer subdivisions with poured-concrete basements, and that mix decides most of the work.
Adding a unit is the project where the cities differ most. Brampton allows up to three units on a lot and requires every additional residential unit to be registered, including units that used to count as legal non-conforming second units, so many Brampton jobs are about bringing an existing basement apartment up to code. Kitchener permits up to four units on residential lots, with up to two in a backyard home. Hamilton allows up to four units in some zones and also permits detached units. Cambridge allows up to three units on a lot with a house, semi or townhouse. We check your zoning before we price a legal basement apartment or a garden suite.
Older houses and basements bring their own checks. In Hamilton, homes built before 2012 can qualify for the city's Protective Plumbing Program, which offers a grant of up to $2,000 toward a backwater valve and related work, as long as the permit is in place before work starts. Kitchener has four heritage conservation districts (St. Mary's, Upper Doon, Victoria Park and Civic Centre), where designated properties may need a heritage permit for changes. Cambridge was formed in 1973 from Galt, Preston and Hespeler, and protects private trees 20 cm or more in diameter, which matters when an addition or new entrance sits near a mature tree. See our projects or request a free quote.
Guides
Plan your project with our guides
-
Basements
How to Make a Basement Apartment Legal in Ontario
A basement apartment is legal in Ontario when zoning allows it, a building permit is issued and closed for it, it meets the Building Code and Fire Code, and it is registered or licensed where your city requires that. Most homes in Hamilton, Brampton, Kitchener and Cambridge can get there, but ceiling height, exits, fire separation and heating are where the work and the money go.
-
Basements
Underpinning vs Bench Footing: Which Is Right for Your Basement?
Underpinning lowers the whole basement, walls and floor together, so you gain full ceiling height wall to wall; a bench footing lowers only the middle of the floor and leaves a concrete ledge around the edge. Underpinning costs roughly twice as much and takes longer, while a bench footing is faster and cheaper but gives up usable floor space along every wall.
-
Permits
Building Permits for Renovations in Hamilton, Brampton, Kitchener and Cambridge
In Hamilton, Brampton, Kitchener and Cambridge you need a building permit for structural changes, additions, new or enlarged openings, new or moved plumbing, basement apartments, underpinning and most decks, while painting, cabinets, counters and same-size window and fixture swaps usually do not. Each city reviews drawings from a qualified designer, charges fees based on the work, and inspects at set stages before closing the permit.
Questions
Frequently asked questions
Do you offer free estimates?
Yes. Send us a short description and a few photos through our quote form. For most projects we then visit your home to measure and give you a written estimate.
Which areas do you serve?
We work in Hamilton (including Stoney Creek), Brampton, Kitchener and Cambridge. Our office is at 57 Glen Echo Drive in Hamilton.
Do you handle building permits?
Yes. We prepare drawings, arrange engineering and apply for permits as part of most projects. Read more about our design and permit service.
Can you make my basement apartment legal?
Yes. We build new legal basement apartments and bring existing ones up to the Building Code and Fire Code.
Ready to start your project?
Tell us what you are planning. We will visit, measure and give you a clear written estimate.