About our bathroom renovations service
A good bathroom renovation is mostly about what you can't see: waterproofing behind the tile, properly sloped shower floors and ventilation that stops mould. We get those right first, then finish with the tile, glass and fixtures you choose.
We renovate main bathrooms, ensuites and powder rooms, and add new bathrooms where there wasn't one. Adding a bathroom in the basement? See basement finishing. Renovating the kitchen at the same time? Our kitchen team can run both on one schedule.
What's included
What we do
- Full bathroom renovation
- New bathroom addition (adding a bathroom)
- Tub-to-shower conversion
- Walk-in and curbless showers
- Glass shower enclosures
- Vanities and countertops
- Floor and wall tiling
- Heated floors
- Toilets, fixtures and faucets
- Accessible and aging-in-place bathrooms (grab bars, walk-in tubs)
- Powder room renovation
- Exhaust fans and ventilation
How your project runs
Site visit
We look at the space, talk through your goals and check zoning and permit needs.
Drawings and estimate
You get a written, itemized estimate and a schedule. We prepare drawings and permits.
Build
One project manager runs the trades and keeps you updated each week.
Inspect and hand over
We book every inspection and walk you through the finished work.
What a full bathroom renovation includes
A full bathroom renovation strips the room to the studs and subfloor, then rebuilds it with new plumbing, waterproofing, tile, fixtures, lighting and ventilation. Gutting the room is often the only way to know the walls and floor are sound, since water damage hides behind old tile and under toilets.
Hamilton, Kitchener and Cambridge homes built before about 1980 often have cast iron or galvanized drains, a toilet flange sitting on rotted subfloor, no exhaust fan, or a fan venting into the attic instead of outside. Older tile adhesives, plaster and floor tiles can also contain asbestos, so we test suspect materials before demolition.
A bathroom is small, but it packs in more trades per square metre than any other room: plumbing, electrical, framing, waterproofing, tile, glass, cabinetry and paint. Getting their order right is most of the job.
Bathroom layouts: powder rooms, main baths and ensuites
The cheapest bathroom layout is the one you already have, because the toilet drain is the hardest thing to move. A 75 mm (3 in) toilet drain needs space and slope in the floor, and moving it across joists can mean opening the ceiling below. Sinks and showers use smaller drains and move more easily.
- Powder room (two-piece): toilet and sink in as little as about 1.5 m by 1.2 m (5 ft by 4 ft). A wall-hung or narrow vanity keeps the door swing clear.
- Main bathroom (three or four-piece): the classic 1.5 m by 2.4 m (5 ft by 8 ft) bathroom found in many Hamilton bungalows and Brampton townhouses holds a tub along the end wall, a toilet and a vanity. Turning that tub into a walk-in shower is one of the most common bathroom upgrades we do.
- Ensuite: more room for a double vanity, a separate shower and sometimes a freestanding tub. Keep the toilet out of the direct line of sight from the bedroom door.
Clearances decide whether a bathroom feels comfortable. Leave at least 380 mm (15 in) from the centre of the toilet to any wall or fixture beside it, and about 530 to 600 mm (21 to 24 in) of clear space in front. A shower should be at least 900 mm by 900 mm (36 by 36 in) inside to be comfortable for most adults.
Adding a bathroom where there was none, such as in a basement or under the stairs, depends on getting drainage to the main stack. Below the sewer line, that may need an ejector pump.
Shower systems compared: tiled, acrylic, curbless and glass
A shower is only as good as the waterproofing behind the tile. Grout and tile are not waterproof. The membrane underneath does the work, which is why we flood-test every pan before tiling.
| Shower system | Strengths | Trade-offs |
|---|---|---|
| Fully tiled with sheet membrane | Any size or shape, niches and benches, clean continuous look | Highest labour cost; depends on careful installation |
| Fully tiled with liquid-applied membrane | Works well around complex shapes and niches | Needs the right thickness in every coat; slower to cure |
| Acrylic or solid-surface base with tiled walls | Fast, factory-sloped, fewer leak points at the floor | Limited to stock sizes; base look is less custom |
| One-piece or panel acrylic kit | Lowest cost, quickest install, few grout lines | Looks basic; may not fit through older doorways |
A curbless shower has no step at the entry, which suits aging in place and makes a small bathroom feel bigger. It needs the floor recessed so the shower can slope to the drain while the bathroom floor stays level, which usually means cutting down or reframing joists. That is a structural change, so we confirm it with an engineer when needed.
Linear drains run along one wall and let you use large-format floor tile because the floor slopes in one direction. Centre drains cost less but need smaller tiles to follow the four-way slope. Either way, the floor should fall about 2 percent (1/4 in per ft) toward the drain.
For glass, frameless panels of 10 mm (3/8 in) tempered glass give the cleanest look. We built a frameless walk-in glass shower in one of our recent bathroom projects, and the open entry means no door to swing or clean around. Semi-frameless and framed doors cost less and seal more tightly against splashes.
Inside the wall, a pressure-balancing or thermostatic valve keeps the water temperature steady when someone flushes a toilet elsewhere in the house and helps prevent scalding.
Tile, vanities, toilets and heated floors
Porcelain tile is the best all-round choice for bathroom floors and showers. It absorbs almost no water, resists stains and comes in every look from marble to concrete. Ceramic tile is softer and cheaper, and it works well on walls. Natural stone such as marble needs sealing and can etch or stain, so use it where you are willing to maintain it.
Large-format tiles (600 mm by 1,200 mm and bigger) mean fewer grout lines but need a very flat substrate, or the edges stand proud of each other. That flattening work adds labour. Epoxy grout costs more than cement grout but resists stains and doesn't need sealing, which makes it a good choice for shower floors.
- Vanities: wall-hung vanities make cleaning easier and a small room look bigger, but need solid blocking in the wall. Floor-standing vanities hold more storage. Quartz tops resist stains better than cultured marble.
- Toilets: one-piece toilets are easier to clean. Wall-hung toilets save about 250 mm (10 in) of floor depth but need an in-wall carrier and usually a 2x6 wall.
- Heated floors: an electric mat under the tile, controlled by a programmable thermostat, takes the chill off a tile floor. It needs its own circuit and GFCI protection, and the electrical work needs an ESA notification.
- Ventilation: a quiet exhaust fan ducted to the outside, sized to the room and controlled by a timer or humidity sensor, is the best defence against mould. As a rough guide, allow about 1 CFM per sq ft of floor and at least 50 CFM.
Tip: Ask for wood blocking behind the tile wherever you might want a grab bar later, even if you don't install one now. It costs very little while the walls are open.
Bathroom renovation cost in Hamilton, Brampton and Kitchener-Waterloo
Published 2026 figures for southern Ontario put most bathroom renovations in Hamilton, Brampton, Kitchener and Cambridge in the broad ranges below. Sources disagree quite a bit, so treat these as a starting point. They vary with the room's size, how much plumbing moves, the tile you choose and what we find behind the walls. We give you an exact price after a site visit.
| Scope | What is included | Typical range (CAD, before HST) |
|---|---|---|
| Powder room | New toilet, vanity, flooring, lighting, paint | $8,000 to $18,000 |
| Standard full bathroom | Gut and rebuild, same layout, tub or tiled shower, mid-range tile and fixtures | $20,000 to $35,000 |
| Upgraded bathroom or ensuite | Custom tiled shower, frameless glass, heated floor, double vanity, some plumbing moves | $35,000 to $60,000 |
| Large luxury ensuite | Layout changes, curbless shower, freestanding tub, premium stone and fixtures | $60,000+ |
The main cost drivers are moving the toilet or shower drain, the amount and size of tile, custom glass, a curbless floor that needs structural work, and repairs to rotted subfloor or old drains found during demolition. A tub-to-shower conversion usually lands in the standard or upgraded band, depending on the glass and tile.
Do you need a permit for a bathroom renovation in Ontario?
Replacing a toilet, sink, tub or shower in the same spot usually needs no building permit. Adding, removing or moving a fixture, changing the drain or vent piping, or altering walls does. The details differ between the four cities we work in:
- Hamilton and Stoney Creek: the City of Hamilton's building permit page says replacing fixtures in the same location needs no permit, but new or relocated plumbing does. It also lists installing or replacing drywall and insulation, and adding or removing any wall, as permit work, so a full gut bathroom in Hamilton usually needs one even when nothing moves.
- Kitchener: the city's permit list exempts tiling, cabinets and a toilet, tub or sink replaced in the same spot, and requires a permit for adding or moving fixtures.
- Cambridge: the building permits page lists plumbing or drains and adding or removing walls as permit work.
- Brampton: the city lists installing or altering plumbing as permit work, and bathroom cupboards with no plumbing changes as exempt, on its when a permit is not required page.
Electrical work is a separate approval. Almost all of it, including new lighting, a heated floor, outlets and a new fan circuit, needs a notification filed with the Electrical Safety Authority before work starts. In Ontario, anyone you hire for electrical work must be a Licensed Electrical Contractor, and they file the notification. Ask for the Certificate of Acceptance when the work passes. ESA's guide to hiring a licensed electrician explains how to check a contractor.
A permitted bathroom gets inspected at rough-in, before the walls close, so the drain slopes, venting and water lines are checked while they are still visible. Our drawings and permits team prepares the plumbing layout and applies for you, and our building permits guide explains the process in Hamilton, Brampton, Kitchener and Cambridge.
Our bathroom renovation process
- Site visit. We measure, check the floor for soft spots, look at the drain and vent routes, and find out where the fan can vent outside.
- Design and quote. We agree on the layout, the shower system and your fixtures and tile, then give you an itemized written price.
- Ordering and permits. Vanities, glass and specialty tile can take weeks, so we order before demolition. If plumbing moves, or your city needs a permit for the scope, we apply for it.
- Demolition. We protect the route through your house, remove everything to the studs and fix any rot or framing problems we uncover.
- Rough-in and inspection. New drains, supply lines, valves, wiring, fan duct and blocking go in. The permit inspection happens here.
- Board and waterproofing. Cement board or foam board goes up, the shower is waterproofed and the pan is flood-tested.
- Tile and finishes. Floor and wall tile, grout, paint, then the vanity, toilet, trim and accessories.
- Glass and final check. The glass is measured after tiling for an exact fit and installed about 1 to 2 weeks later. We finish with final inspections and a walkthrough.
Bathroom renovation timeline
Most full bathrooms take 2 to 4 weeks on site, and a powder room often takes 1 to 2 weeks. Add 2 to 6 weeks before that for design, ordering and, where plumbing moves, the permit.
The one wait most people don't expect is the glass. A frameless shower panel can only be measured once the tile is on, so there is often a gap of a week or two when the bathroom is usable but the glass isn't in. We plan the rest of the finishing around it.
A bathroom renovation timeline grows when demolition reveals rotted subfloor or failed drains, when a tile order is short, or when the layout changes after rough-in. Choosing all your tile and fixtures before we start avoids most of these delays.
Living through a bathroom renovation
If this is your only bathroom, plan for it before we start. Options include a portable toilet on site, staying with family for the wettest stages, or asking us to keep a toilet working until the last possible day and reinstall it as soon as the floor is tiled. In a house with two bathrooms, we can sequence the work so one always works.
Demolition is the loudest and dustiest part and usually takes one to two days. We seal the doorway, cover the floors to the exit, and vent dust out a window where we can. Water to the house will be off for short periods during rough-in, and we tell you the day before.
Empty the vanity, medicine cabinet and linen closet before day one, and clear a path from the door to the bathroom. If you have older parents in the house, tell us early so we can plan an accessible layout and keep their routines in mind.
Choosing a bathroom renovation contractor
Most bathroom failures come from poor waterproofing and poor ventilation, so focus your questions there:
- Which waterproofing membrane do you use, and do you flood-test the shower before tiling?
- Where will the exhaust fan vent, and how is it sized?
- Does the quote include repairing rotted subfloor if you find it, and at what rate?
- Who files the plumbing permit and the ESA notification? Who does the electrical work?
- Can you provide a current WSIB clearance certificate? See the WSIB clearance FAQ.
- Is the payment schedule tied to completed stages, and how are changes priced?
- What written warranty covers your workmanship? We have renovated homes since 2020 and back our work with a 2-year workmanship warranty.
A bathroom is often part of a bigger plan. If you are adding a bathroom in a finished basement or a legal basement apartment, the drainage design changes, and we plan both together. Renovating the kitchen too? Our kitchen renovations can run on the same schedule. See finished work in our projects gallery, or request a free quote.
Bathroom renovations: common questions
How long does a bathroom renovation take?
A typical full bathroom takes 2 to 4 weeks on site, depending on tile work and whether plumbing moves.
Can you make a bathroom safer for an older parent?
Yes. We build curbless showers, add blocking for grab bars, widen doors and install comfort-height toilets, so the bathroom works now and later.
What waterproofing do you use in showers?
We install a full waterproofing membrane on the shower walls and floor before tiling, and flood-test the shower pan before the tile goes on.
How much does a tub-to-shower conversion cost?
In Hamilton and the surrounding area, most conversions fall within the standard or upgraded full-bathroom ranges on this page, depending on the tile, glass and whether the drain moves. We give you an exact price after a site visit.
Is a curbless shower possible in my bathroom?
Often, yes. The shower floor has to be recessed so it can slope to the drain, which can mean reworking the floor joists. We check the framing at the site visit before recommending it.
Do I need a permit to replace my bathroom fixtures?
Usually not if the toilet, sink and tub stay in the same spots. Moving or adding fixtures, or changing drain piping, needs a permit, and new wiring needs an ESA notification. In Hamilton, replacing drywall or insulation also needs a permit.
Are heated bathroom floors worth it?
For a tiled floor used every morning, most people think so. An electric mat runs on a thermostat and needs its own circuit with an ESA notification.
Why does my bathroom get mould even with a fan?
The fan is often too small, too loud to be used, or venting into the attic instead of outside. We size the fan to the room, duct it outside and add a timer or humidity control.
What tile is best for a shower floor?
Porcelain mosaics or smaller porcelain tiles give good grip and follow the slope of a centre drain. With a linear drain, larger tiles work because the floor slopes one way.
Can you add a bathroom to my basement?
Usually, yes. The key question is whether new drains can reach the main stack by gravity or need an ejector pump. See our basement finishing service for more.