About our design and permits service
Permits are where many projects stall. We prepare the drawings, arrange engineering and heat-loss calculations, submit the permit application and answer the city's comments. If your project doesn't fit the zoning by-law, we apply for a minor variance.
Once the permit is issued, we act as your general contractor: we schedule every trade, book every inspection and keep you updated. We use this process on every project, from a legal basement apartment to a new custom home.
What's included
Design
- Free consultation and on-site estimate
- Architectural drawings and floor plans
- Engineering (structural, HVAC and heat-loss calculations)
- Interior design and material selection
- 3D renderings
Permits and inspections
- Building permit applications
- Committee of Adjustment and minor variance applications
- City building inspections
- Electrical Safety Authority (ESA) inspections
- Fire inspection coordination for second units
Project management
- General contracting (managing all trades)
- Project scheduling and budgeting
- Financing options for clients
- Written workmanship warranty
How your project runs
Site visit
We look at the space, talk through your goals and check zoning and permit needs.
Drawings and estimate
You get a written, itemized estimate and a schedule. We prepare drawings and permits.
Build
One project manager runs the trades and keeps you updated each week.
Inspect and hand over
We book every inspection and walk you through the finished work.
What goes into a set of permit drawings
A permit drawing set has to show the examiner that every part of the project meets the Ontario Building Code and your zoning by-law. Missing pieces are the most common reason a permit stalls. For a typical addition, second unit or new house, the set includes:
- Site plan: based on a current survey, showing lot lines, setbacks, the existing and new buildings, and grades.
- Floor plans: every level, with room names, dimensions, door and window sizes, stairs, smoke and carbon monoxide alarms.
- Elevations and sections: heights, roof slopes, wall assemblies, insulation values and window areas for spatial separation.
- Structural design: beams, posts, footings and connections, stamped by a structural engineer where the work goes beyond the Code's prescriptive tables.
- HVAC design: room-by-room heat-loss and heat-gain calculations and a duct layout, used to size the furnace, heat pump or air conditioner.
- Energy compliance: the energy efficiency path chosen for the house, with insulation levels and equipment efficiencies.
- Supporting reports: grading plan, arborist report, demolition or shoring details where needed.
In Ontario, permit drawings must be prepared by a designer who holds a Building Code Identification Number (BCIN) for that type of building, or by an architect or engineer. A homeowner can design their own house, but most owners use a qualified designer so the examiner has someone accountable to answer comments.
When you need a building permit in Hamilton, Brampton, Kitchener and Cambridge
You need a building permit any time you build, add to, structurally alter or change the use of a building. That covers most of the work people ask us about. The rules come from the provincial Building Code, so the list is close to the same in each city, but each city's application process and small exemptions are different.
| Usually needs a permit | Usually doesn't need a permit |
|---|---|
| Additions, second storeys and new houses | Painting, flooring and trim |
| Removing or changing a load-bearing wall | Replacing kitchen cabinets and countertops in the same layout |
| Finishing a basement with new walls and plumbing, or creating a second unit | Replacing fixtures in the same location |
| Underpinning, new basement entrances and window enlargements | Re-roofing with the same material, without structural change |
| Decks 600 mm or more above grade, and in Hamilton and Brampton any attached deck | Low, small, freestanding decks in some cities |
| New plumbing drains, backwater valves, or new or altered ductwork | Like-for-like window replacement in the same opening |
Electrical work needs a separate notification to the Electrical Safety Authority, done by a licensed electrical contractor. Check your own city's list before starting, because details differ. Kitchener and Brampton both publish clear lists, and our guide to building permits in Hamilton, Brampton, Kitchener and Cambridge compares all four cities.
The building permit process, step by step
The permit process in every Ontario city follows the same path: confirm zoning, submit a complete application, answer the examiner, then get the permit. Under the Building Code, the city must decide on a complete application within a set review period that depends on the building type.
| Project type | Code review period for a complete application |
|---|---|
| Houses, semis, additions, renovations, decks and detached garages | 10 business days |
| Townhouses and small Part 9 buildings (three storeys or less, up to 600 m²) | 15 business days |
| Larger Part 3 buildings | 20 business days |
| High and complex buildings | 30 business days |
- Zoning check: the project must meet zoning, or have a minor variance approved, before the permit can be issued.
- Application: drawings, forms, designer information and fees submitted online. Hamilton takes applications through its online customer portal, and fees must be paid in full before the application counts as received; its building permit requirements page lists what to include. Brampton uses the Brampton Building and Business Portal, Kitchener has its own online service portal, and Cambridge uses its City Application Portal, described on Cambridge's building permits page.
- Review: the examiner checks zoning and Code compliance and either issues the permit or sends a list of deficiencies.
- Resubmission: we revise the drawings and answer each comment. Each round restarts part of the review.
- Issuance: the permit and stamped drawings are issued and must be kept on site.
The review clock only runs on a complete application. In practice a house permit takes from a few weeks to a few months once comment rounds are counted, which is why a clean first submission saves more time than anything else.
Committee of Adjustment and minor variances explained
A minor variance is permission to depart slightly from the zoning by-law, granted by your city's Committee of Adjustment. Hamilton, Brampton, Kitchener and Cambridge each have their own committee. You need a variance when your design breaks a zoning rule such as a setback, height, lot coverage or floor area limit. It is often faster than redesigning when the project only misses by a small amount.
The Committee applies four tests set out in Ontario's Planning Act. The variance must:
- be minor;
- be desirable for the appropriate development of the land;
- maintain the general intent and purpose of the zoning by-law;
- maintain the general intent and purpose of the Official Plan.
The process usually runs like this. First, confirm the exact variances needed. Hamilton recommends a Zoning Compliance Review when they are unclear, and Cambridge strongly recommends a pre-consultation with the Committee's planner. Then the application goes to the Committee with drawings and fees. The city circulates it for comment, nearby owners get notice, you post a sign on the property, and the Committee holds a public hearing. Hamilton aims to set a hearing within 30 days of submission, while Kitchener and Cambridge committees meet monthly.
After a decision there is a 20-day appeal period, and appeals go to the Ontario Land Tribunal. Since 2022, neighbours can no longer appeal a minor variance decision; appeals are limited to the applicant, the Minister, the municipality and certain public bodies.
Tip: Talk to your neighbours before the notice arrives. Even though they can't appeal, their comments at the hearing can lead the Committee to add conditions or ask for changes.
Building inspections: what the inspector checks and when
Once the permit is issued, the city inspects the work at set stages, and each stage must pass before it is covered up. Under the Building Code, the inspector must generally attend within two days of being notified that a stage is ready, so we book each inspection as soon as the work is done. Missing an inspection can mean opening finished walls later.
For a house, addition or second unit, the main inspections are:
- Footings: after the forms are set and before the concrete is poured.
- Foundation: walls, damp-proofing and drainage, before backfill.
- Plumbing: underground drains and water service before backfill, then rough-in before walls are closed.
- Framing and HVAC rough-in: structure, beams, ductwork and exhaust.
- Fire separations: required between units and between a house and attached garage.
- Insulation and vapour barrier: before drywall.
- Occupancy and final: exits, alarms, guards, fixtures and exterior work, which close the permit.
Electrical work is inspected separately by the ESA. For a legal basement apartment in an existing house, the local fire service may also inspect under the Fire Code, and Brampton also requires the unit to be registered with the city. We book each inspection, attend it and fix anything the inspector flags. The province's guide to adding a second unit explains how these rules fit together.
How long drawings and permits take for common projects
Design and approval time depends more on the project's complexity and the city's backlog than on the project's size. Use these typical ranges for planning, from first site visit to permit in hand. They are typical estimates, and a minor variance adds roughly 2 to 4 months to any of them.
| Project | Drawings and engineering | Permit review and comments |
|---|---|---|
| Basement second unit | 2 to 4 weeks | 3 to 8 weeks |
| Underpinning or new basement entrance | 2 to 4 weeks | 2 to 6 weeks |
| Structural wall removal | 1 to 3 weeks | 2 to 6 weeks |
| Rear addition or second storey | 4 to 10 weeks | 4 to 12 weeks |
| New custom home or multiplex | 8 to 16 weeks | 6 to 16 weeks |
Some projects need extra approvals that run alongside the permit. Tree permits, heritage permits and conservation authority permits each have their own timelines. A lot near the Niagara Escarpment, a creek or the Grand River, a designated house or a large tree close to the work can each add weeks. Brampton, for example, will not let a permit proceed on regulated land until the conservation authority approves. We check for all of these during the first site visit so they start early.
What drawings, engineering and permits cost
Design and permit costs are usually a small share of the project, but they vary widely with scope. A simple structural change needs one engineer's letter and drawing. A new house needs a full design team. These ranges are typical for Hamilton, Brampton and Kitchener-Waterloo in 2026 and vary by size and complexity, and we confirm the price after a site visit.
| Project | Typical drawings and engineering cost |
|---|---|
| Load-bearing wall removal (engineered beam design) | $1,500 to $4,000 |
| Basement second unit permit drawings | $3,000 to $8,000 |
| Rear addition or second storey | $8,000 to $25,000 |
| New custom home | $25,000 to $75,000 or more |
Design fees rise with the number of storeys, the amount of structural engineering, and how many revisions the design goes through. A minor variance often means a second round of drawings. Engineers may also need to visit the site during construction to review footings, beams or shoring, which is billed separately on some projects.
City permit fees are extra and are usually charged by floor area, so a new house pays more than a renovation. As an example, Kitchener's 2026 fees are $0.37 per sq ft for interior alterations and basement finishing (minimum $95) and $1.07 per sq ft for additions, plus a $250 deposit refunded when the final inspection passes. A minor variance adds the Committee of Adjustment fee, which in 2026 is $2,295 in Cambridge and $1,800 to $3,110 in Kitchener, plus the cost of revised drawings. Development charges, where they apply to new units, are separate again and are covered on our new home construction page.
Interior design, 3D renderings and material selection
Permit drawings show what gets built. Interior design decides how it looks and works day to day. We do both together so the layout in the permit set already fits your cabinets, fixtures and furniture, and nothing has to move after framing.
The design stage usually includes:
- Layout planning: kitchen work zones, bathroom clearances, storage and furniture placement, checked against the Code minimums for stairs, doors and ceiling heights.
- 3D renderings: views of key rooms so you can judge proportions, light and finishes before anything is ordered.
- Material selection: flooring, tile, cabinetry, counters, fixtures and lighting, chosen to your budget with lead times noted.
- Finish schedule: one list of every selected item, so trades install the right product in the right room.
Making selections before construction starts is the single best way to protect your budget and schedule. Late choices cause most change orders. For kitchens in particular, our kitchen renovation guide walks through layouts and costs, and our bathroom renovation page covers options such as frameless walk-in glass showers.
Project management and general contracting after the permit
A permit only lets the work start. As your general contractor, we turn the approved drawings into a schedule, hire and coordinate every trade, and keep the job on budget. You get one point of contact for questions, changes and payments.
What that looks like on a typical job:
- Schedule: a written schedule by stage, updated as the job moves, with inspections built in.
- Budget and change orders: every change is priced in writing and approved by you before work proceeds.
- Payments: tied to completed stages. Ontario's Construction Act lets you hold back 10% of each payment until the lien period ends, which protects you if a subcontractor or supplier goes unpaid.
- Site safety: all trades on site carry WSIB coverage where required. You can confirm a contractor's status through WSIB clearance certificates.
- Locates and neighbours: utility locates through Ontario One Call before any digging, plus notice to neighbours for noise and access.
- After handover: a 2-year workmanship warranty, so you know who to call if something we built needs attention.
We have followed this process since 2020 on every type of job, from a basement renovation to a home addition, and on commercial fit-outs such as a jewellery store we completed.
Why permits get delayed and how we prevent it
Most permit delays come from a handful of avoidable problems. Catching them before submission is faster than fixing them after the examiner's comments arrive.
- Out-of-date survey: a survey that doesn't show a newer deck, shed or fence can give wrong setbacks. We confirm the survey against the site. Brampton notes that it does not keep surveys for every property, so you need your own.
- Zoning surprises: a design that misses a setback by 30 cm still needs a variance. We check zoning before the design is finalized.
- Missing HVAC or energy information: examiners send back applications without heat-loss calculations or an energy compliance path.
- Structural gaps: beams and point loads without engineering, or engineered floor and truss layouts that don't match the drawings.
- Other approvals not started: tree, heritage or conservation authority approvals that must come before the building permit.
- Unpaid fees: Hamilton and Cambridge do not treat an application as complete until the fees are paid.
- Slow answers to comments: we answer examiner comments promptly and in one complete resubmission where possible.
If you already have drawings from another designer, we can review them before you apply. Homeowners planning a second unit can check Brampton's additional residential units page, which covers registration, or Cambridge's additional residential units page. To start your project, send us the details through our free quote form.
Design and permits: common questions
How long does it take to get a building permit?
Under Ontario's Building Code, cities must decide on a complete house permit application within 10 business days. Larger projects and incomplete applications take longer, and a minor variance can add 2 to 4 months.
What happens if I renovate without a permit?
The city can issue a stop-work order, require you to open finished walls for inspection, or order the work removed. Unpermitted work can also cause problems with insurance and when you sell.
Can you take over a project another contractor started?
Yes. We review what has been built, check it against the permit and drawings, and give you a plan and price to finish it.
Who can prepare drawings for a building permit in Ontario?
A designer with a Building Code Identification Number (BCIN) qualified for that building type, an architect or an engineer. Homeowners may also design their own house.
What are the four tests for a minor variance?
The variance must be minor, be desirable for the appropriate development of the land, and maintain the general intent of both the zoning by-law and the Official Plan.
Can my neighbour appeal my minor variance?
Since 2022, Ontario has limited appeals of minor variance decisions to the applicant, the municipality and certain public bodies, so neighbours generally cannot appeal. They can still comment at the hearing.
Do I need heat-loss calculations for a renovation?
You need them whenever the project adds or changes heating or cooling, such as an addition, a second unit or a new house. The examiner uses them to confirm the equipment and ducts are sized correctly.
How long is a building permit valid?
A city can revoke a permit if work hasn't seriously started within six months of issuance, or if work stops for a year. Ask for an extension in writing if your start is delayed.
Do I need a permit to remove a wall?
Yes, if the wall is load-bearing. An engineer designs the beam and posts, and the city inspects them before the ceiling is closed. Kitchener, for example, does not require a permit to remove a non-load-bearing wall in a house.
Can I apply for the permit myself?
Yes, an owner can apply, but the drawings must still be prepared by a qualified designer. Many owners prefer that the designer or contractor handles examiner comments directly.
Is Stoney Creek covered by Hamilton's permit rules?
Yes. Stoney Creek is part of the City of Hamilton, so building permits, zoning and the Committee of Adjustment are all handled by the City of Hamilton.
Helpful resources
Official guidance we follow on every design and permits project:
- Building permit requirements in Hamilton — City of Hamilton
- When you need a building permit in Kitchener — City of Kitchener
- Building permits in Cambridge — City of Cambridge
- Ontario's Building Code — Government of Ontario
- WSIB clearance certificates explained — WSIB Ontario
- Check a new home builder’s licence — Home Construction Regulatory Authority