Renovation questions, answered

Common questions about working with The Smart Renovations Inc. Each service page has more answers about that type of project.

The basics

Do you offer free estimates?

Yes. Send us a short description and a few photos through our quote form. For most projects we then visit your home to measure and give you a written estimate.

Which areas do you serve?

We work in Hamilton (including Stoney Creek), Brampton, Kitchener and Cambridge. Our office is at 57 Glen Echo Drive in Hamilton.

Do you handle building permits?

Yes. We prepare drawings, arrange engineering and apply for permits as part of most projects. Read more about our design and permit service.

Can you make my basement apartment legal?

Yes. We build new legal basement apartments and bring existing ones up to the Building Code and Fire Code.

How do payments work?

We agree on a payment schedule tied to stages of the work before we start, and put it in your written contract. You never pay for work that has not been done.

Do you offer financing?

Ask us about financing options when you request your quote.

Do you offer a warranty?

Yes. Every project comes with our 2-year workmanship warranty, written into your contract.

Are you insured?

Ask us for proof of liability insurance and a WSIB clearance certificate before work starts. Any contractor you hire should provide both.

How long will my project take?

It depends on the project and the permit. Each service page gives typical timelines, for example kitchens and bathrooms. You get a written schedule before we start.

Getting started and estimates

What should I have ready before I ask for a quote?

A short description of what you want to change, a few photos and a rough budget range are enough to start. If you have existing drawings, a property survey or photos of your electrical panel, send those too. A survey matters most for additions, decks and new homes, because the permit drawings are based on it.

Is your estimate a fixed price?

The estimate is itemized and priced for the scope we agree on. Items you choose later, such as tile or plumbing fixtures, are shown as allowances so you can see how your selections change the total. If we find something nobody could see before work started, such as rot behind a wall, we price it in writing and wait for your approval before doing it.

Why do renovation quotes for the same job vary so much?

Usually because they don't cover the same work. One quote may include drawings, permit fees, engineering, disposal and painting while another leaves them out. Line up the quotes item by item, and ask each contractor what is excluded, before you compare totals.

Do I need an architect or designer before I call you?

No. We arrange drawings and engineering as part of our design and permit service. If you already work with a designer or architect, we build from their plans and give pricing feedback while the design can still change.

How far ahead should I contact you?

For a kitchen or bathroom, a few weeks to a couple of months ahead is usually enough, depending on cabinet and material lead times. For a basement apartment, addition or new home, start three to six months or more before you want construction to begin, because drawings and permits come first. Our guide to the custom home building process shows how long each stage takes.

Can you work within a set budget?

Yes, and it helps to tell us the number early. We can suggest where to spend and where to save, or split the work into phases, such as doing the structural and mechanical work now and the finishes later. It is cheaper to adjust the scope at the drawing stage than during construction.

Permits and inspections

Who applies for the building permit, me or you?

We do, with your written authorization as the owner. We prepare the drawings and forms, pay the fees on your behalf as set out in your contract, and answer the plans examiner's questions. You get a copy of the issued permit, and it is posted on site during the work.

Do I need a permit to replace kitchen cabinets or flooring?

Usually not, if you are replacing finishes in the same layout. A permit is generally needed once you move or add plumbing, remove or alter walls, change the structure or add a unit. Hamilton, for example, says cabinetry and flooring such as carpet, laminate or hardwood don't need a permit, but finishing a basement, replacing drywall and insulation, or adding or removing walls does. See the City of Hamilton's building permit requirements, check with your own city's building department, or ask us.

Who is allowed to prepare permit drawings in Ontario?

Homeowners may draw plans for their own house. Otherwise, permit drawings must come from an architect, a professional engineer or a designer who is qualified and registered under the Building Code, known as a BCIN holder. Structural elements such as beams and underpinning usually also need an engineer's design.

What inspections will my renovation need?

It depends on the work, but typical stages are excavation and footings, framing, plumbing rough-in, insulation and vapour barrier, and a final inspection. Electrical work is inspected separately by the ESA. In Ontario, the city must carry out an inspection within two working days of being notified that a stage is ready.

What paperwork should I get when the job is finished?

Ask for proof that the building permit was closed after the final inspection, the ESA certificate of acceptance, and any engineer's site review letters. Keep these with your house records. Buyers, lenders and insurers often ask for them.

I bought a house with unpermitted work. Can you fix it?

Usually, yes. We assess what was built, prepare drawings and apply for a permit for the existing work. Parts of walls or ceilings may need to be opened so the inspector can see the framing, wiring and plumbing, and anything that doesn't meet code is corrected before it is closed up again.

Do I need any approvals besides a building permit?

Sometimes. Cambridge requires a permit to injure or remove a private tree 20 cm or more in diameter, Kitchener may require a tree conservation permit, and Hamilton has no city-wide private tree by-law. Kitchener projects can also need a driveway widening permit. Lots near ravines or watercourses may need a conservation authority permit, and heritage properties need heritage approval. We check these during the site visit.

Costs and payments

How much do I pay up front?

Your contract sets a deposit and a payment for each completed stage, such as framing inspected or drywall finished. The deposit typically covers drawings and ordering long-lead items like windows and cabinets. Each later payment matches work you can see on site.

What is an allowance in a renovation estimate?

An allowance is a set amount for an item you haven't picked yet, such as an amount per square foot for tile or a fixed sum for a vanity. If you choose something that costs more or less, the difference is added or credited. Allowances let us price the job before every finish is selected.

How do change orders work?

If you want to change the scope during the job, or we find a hidden problem, we write up the change with its price and any effect on the schedule. Work on the change starts only after you approve it in writing. This keeps the final invoice free of surprises.

What costs do homeowners often forget to budget for?

Permit fees, engineering, HST at 13%, appliances, window coverings, moving and storage, and temporary living costs if you move out. Older houses also tend to need electrical or plumbing upgrades once walls are open. Set aside a contingency of 10 to 15%, or more for an older house.

Are there rebates for energy upgrades?

There are often rebates for heat pumps, insulation, windows and similar upgrades through programs such as the Home Renovation Savings Program. Programs and amounts change often, and some require an energy assessment before work starts. We check what is available before you buy, and our HVAC and energy upgrade page has more detail.

Why is a renovation in an older house usually more expensive?

Older houses often need work you can't see from the room itself, such as replacing knob-and-tube wiring, galvanized pipes or cast-iron drains, and dealing with materials that may contain asbestos. Floors and walls are rarely level or square, which adds labour to cabinets, tile and trim. We look for these issues at the site visit so they are in the estimate.

Legal basements and rental units

How many units can I have on my property?

Ontario allows up to three units on many urban residential lots without a rezoning, either all three in the house or two in the house and one in a separate building such as a garden suite. Kitchener permits up to four units on residential lots and Hamilton allows up to four in some zones, while Brampton and Cambridge allow up to three. Your city's zoning still sets standards like setbacks and lot coverage, so we check your lot before you commit.

What makes an existing basement apartment illegal?

Most often, it was built without a permit or never inspected. Common gaps are missing fire separations, no interconnected smoke and CO alarms, bedroom windows too small to escape through, low ceilings and shared ductwork without smoke protection. We can assess an existing unit and bring it up to code through our legal basement apartment service.

How big does a basement bedroom window need to be?

Under the Ontario Building Code, a bedroom egress window needs an unobstructed opening of at least 0.35 m², with no dimension less than 380 mm. If the window opens into a window well, the well needs at least 550 mm of clear space in front of the window. Deep wells need a way to climb out.

Do I have to register my basement unit with the city?

It depends on the city. Brampton requires every additional residential unit to be registered, including units previously treated as legal non-conforming second units, through a registration building permit with a $200 registration fee. Hamilton, Kitchener and Cambridge don't list a separate registration step: Kitchener requires a building permit and, for most units, a zoning (occupancy) certificate, and Cambridge requires a building permit and occupancy approval from its Building Services Division. In Hamilton, a rented unit in Wards 1 and 8 and parts of Ward 14 needs a rental housing licence. Rules change, so check your city's current requirements or ask us.

Do development charges apply to a basement apartment?

Development charges are not collected for a second unit in an existing house, according to the province's guide to adding a second unit. You still pay building permit fees, and Hamilton notes that an additional dwelling unit may be subject to parkland and development charges depending on the project. Larger projects, such as a multiplex rebuild, can be treated differently, so we confirm costs with your city.

Can I build a garden suite instead of a basement unit?

Often, yes. Hamilton permits detached additional dwelling units, Kitchener allows one or two units in a backyard home, Brampton allows a garden suite as one of its three units, and Cambridge allows one unit in a detached accessory building. Each city sets its own size and setback rules. We build both through our new construction service.

Can I keep living upstairs while you build the basement unit?

Usually, yes. Expect short planned shut-offs of water, power or heat when we connect new services, and some noise and dust control around the basement stairs. We give you notice of any shut-off ahead of time.

Living through a renovation

How should I prepare my home before work starts?

Clear the work area and the path to it, and store valuables and fragile items in another room. Agree with us on which entrance, washroom and parking spot the crew will use. If you have alarms or smart locks, set up a code or access plan for the crew.

How do you control dust?

We put up plastic dust walls with zip doors, cover return-air vents so dust doesn't travel through the ducts, and lay floor protection on every route the crew uses. Sanding and cutting happen inside the sealed area or outdoors. The area is swept and debris removed at the end of each day.

What hours will the crew work?

We work within your city's noise by-law. Hamilton sets permitted construction times of 7 a.m. to 10 p.m., and Kitchener allows construction noise between 7 a.m. and 7 p.m., seven days a week. Brampton and Cambridge set their own limits, and we agree on daily start times with you before the job begins.

Is it safe for kids and pets to be home during the work?

Yes, with some ground rules. Keep children and pets out of the work area, which we close off and mark. Open excavations are guarded, live wiring is capped, and tools and chemicals are put away when the crew leaves.

What happens if you find a problem behind a wall?

We stop that part of the work, show you what we found and explain the options. If it changes the price or the schedule, you get it in writing before we continue. Common finds in older houses include rot, old wiring and undersized framing; our whole-home renovation page covers how we plan for them.

How do you keep things good with my neighbours?

We tell you before noisy or disruptive work so you can let neighbours know. Trucks and bins are placed so they don't block driveways, and any street permit for a bin is arranged in advance. Before digging near a property line, we confirm the line from your survey.

New homes and additions

How do I check that a new home builder is licensed?

Look the builder up in the Ontario Builder Directory on the Home Construction Regulatory Authority (HCRA) website. Any builder you hire for a new home in Ontario, including a custom home on land you already own, must be licensed. The builder must also enrol the home with Tarion before construction starts.

What does the Tarion warranty cover on a new custom home?

The statutory warranty has three main parts: one year for workmanship and materials, two years for items such as water penetration and the electrical, plumbing and heating systems, and seven years for major structural defects. The details and limits are on Tarion's warranty page. Renovations and additions to an existing house aren't covered by Tarion. Our renovation work comes with our own 2-year workmanship warranty.

What approvals does a knockdown rebuild need?

A demolition permit, a building permit for the new house and, in many cases, a minor variance if the design doesn't fit the zoning by-law. Utilities have to be disconnected before demolition, and trees on or near the lot may need a tree permit. Our guide to building a custom home walks through each step.

Do I need a property survey for an addition or new home?

Yes. The site plan in your permit drawings is based on a survey showing property lines and existing buildings, and a new home usually needs a topographic survey with grades as well. If you don't have a recent survey, we can arrange one through an Ontario land surveyor.

Can I stay in my house while you build an addition?

For most rear and side additions, yes. The new space is built and closed in first, and the opening into the existing house is made near the end, behind a dust wall. A second-storey addition is different, because the roof comes off, so most families move out for part of that job.

Can I build a multiplex on my lot?

Kitchener permits up to four dwelling units on residential lots, though some lots allow fewer because of zoning or servicing limits. Hamilton allows up to four units in some zones, while Brampton and Cambridge allow up to three units on a lot. We review your zoning and price the options through our new home construction service.

Questions about a specific service

Still have a question?

Tell us what you are planning. We will visit, measure and give you a clear written estimate.