Key takeaways
- Cabinets usually take 30 to 40% of a kitchen budget, so cabinet choices shape the final cost more than anything else.
- Keeping the sink, range and fridge where they are saves thousands in plumbing, gas and electrical work.
- Removing a load-bearing wall needs an engineer, a beam and a building permit, and often adds $8,000 to $25,000 or more.
- A ducted range hood vented outside is the most effective way to keep grease, moisture and smells out of your home.
- Order cabinets and countertops early, because their lead times set most of the kitchen renovation timeline.
Kitchen renovation cost in Hamilton, Brampton and Kitchener-Waterloo: budget tiers
Kitchen renovation costs in Hamilton, Brampton, Kitchener and Cambridge fall into three broad tiers. The biggest jump in price comes when you replace all the cabinets and when you move plumbing, gas or walls. Pick your tier first, then set your finish choices to match it.
| Tier | Typical cost | What it usually includes |
|---|---|---|
| Refresh | $15,000 to $40,000 | Painted or refaced cabinets, new counters, backsplash, sink and faucet, hardware, lighting |
| Mid-range full renovation | $40,000 to $75,000 | New semi-custom cabinets, quartz counters, new flooring, pot lights, appliance install, same layout |
| High-end or custom | $75,000 to $150,000+ | Custom cabinets, large island, premium appliances, layout changes, wall removal, stone slabs |
Kitchen size matters, but less than you might expect. A small kitchen with custom cabinets and a wall removal can cost more than a large one with stock cabinets in the same layout. Older homes in Hamilton, Kitchener and Cambridge, built before about 1970, often land at the higher end because of outdated wiring, plaster walls and uneven floors.
These are typical ranges that vary by size, finishes and site conditions. You get an exact price after a site visit. Our kitchen renovation service covers design, permits and installation. Building new? Our custom home building guide covers kitchens in a new build.
Kitchen renovation cost breakdown
Knowing where the money goes helps you decide where to spend and where to save. This split is typical for a mid-range full renovation with no wall removal.
| Item | Share of budget | Notes |
|---|---|---|
| Cabinets and hardware | 30 to 40% | Biggest single cost; box material and door style drive price |
| Installation labour | 15 to 25% | Demolition, carpentry, cabinet install, trim |
| Countertops | 8 to 15% | Material, edge profile, cut-outs, waterfall ends |
| Appliances | 10 to 20% | Can be far more with panel-ready or pro-style units |
| Plumbing and electrical | 5 to 12% | New circuits, pot lights, moved sink or gas line |
| Flooring | 4 to 8% | Tile or engineered wood, subfloor repair |
| Backsplash, paint and drywall | 4 to 8% | Tile choice and pattern matter most |
| Lighting fixtures | 2 to 5% | Pendants, under-cabinet strips, pot lights |
| Design, drawings and permits | 2 to 5% | Higher with structural work |
| Contingency | 10 to 15% | Hidden wiring, rot, plumbing or subfloor problems |
Expect to use the contingency. Opening up walls in a 1950s or 1960s house on the Hamilton Mountain, in Stoney Creek or in central Kitchener often reveals ungrounded wiring, old galvanized pipe or water damage under the sink. Setting money aside keeps those discoveries from stopping the job.
Kitchen layouts: galley, L-shape, U-shape, island and peninsula
The right layout depends on your room shape, how many people cook and how open you want the space. Good layouts keep the sink, range and fridge within a few steps of each other and leave enough aisle space to open doors and pass. A common design guideline is about 1,050 mm (42 in) of aisle for one cook and 1,200 mm (48 in) for two.
| Layout | Best for | Pros | Cons |
|---|---|---|---|
| Galley | Narrow rooms, condos, townhouses | Efficient work zone, lots of counter for the footprint, lower cost | One cook at a time, can feel closed in, through-traffic conflicts |
| L-shape | Open-concept and corner spaces | Flexible, open to dining, room for a table or island | Corner cabinets waste space without special hardware, longer walking distances |
| U-shape | Larger closed or semi-open kitchens | Most storage and counter, clear work zone | Two awkward corners, can feel boxed in, needs width |
| Island | Open-concept homes with space | Extra prep space, seating, storage, social layout | Needs at least about 1,050 mm of clearance on all working sides; plumbing or power in an island adds cost |
| Peninsula | Medium rooms too tight for an island | Island benefits in less space, seating, separates kitchen from living | One entry point, can create a bottleneck |
Moving the sink or range
Moving the sink means new drain and vent lines, and moving a gas range means a new gas line run by a licensed gas fitter. An island sink also needs a vent solution, often an air admittance valve where allowed or a loop vent. Keep the main fixtures in place if budget is tight, and change the layout around them.
Tip: Tape the new island outline on the floor and live with it for a few days. You will quickly feel whether the aisles are wide enough.
Before
Cabinet types: stock, semi-custom, custom and refacing
Cabinets are the largest line in your kitchen budget, and the type you choose sets your price tier. The difference between them is mostly about sizing, materials and lead time.
Stock cabinets
Stock cabinets come in fixed widths, usually in 75 mm (3 in) steps, and are often ready in days to a couple of weeks. They are the lowest-cost option and work well in standard layouts. Filler strips cover gaps, which can waste some space in odd-sized rooms.
Semi-custom cabinets
Semi-custom lines offer more sizes, finishes and inserts, with some depth and height changes. Lead times are often 3 to 6 weeks. They suit most mid-range renovations.
Custom cabinets
Custom cabinets are built to your exact measurements, so they fill the room and can include tall pantries, appliance garages and furniture-style islands. Many local custom cabinet shops quote 4 to 8 weeks after drawings are signed. They cost the most and give the best fit.
Refacing and painting
If your cabinet boxes are solid and the layout works, refacing replaces the doors, drawer fronts and veneer on the face frames. Painting is cheaper again. Both suit a refresh budget, but neither fixes a poor layout or water-damaged boxes under the sink.
Storage worth paying for
- Deep drawers for pots instead of lower cabinets with shelves.
- Pull-out pantry or tall pantry cabinets.
- Corner solutions such as blind-corner pull-outs.
- Integrated waste and recycling pull-outs.
Cabinet materials and finishes
Cabinet quality comes down to the box, the doors and the hardware. A good box and good hinges matter more than a fancy door, because they decide how the cabinet holds up to steam and daily use.
Cabinet box materials
- Plywood: strong, holds screws well and handles moisture better than particleboard. Common in mid and high-end lines.
- Melamine-faced particleboard: the most common box in stock and many semi-custom lines. Good value, but swells if water gets past the edge banding.
- MDF: used mainly for painted doors because it stays flat and smooth.
Door styles and finishes
- Shaker: simple recessed panel, fits most homes.
- Slab: flat doors for a modern look, in lacquer, laminate or wood veneer.
- Painted or lacquered MDF: smooth colour finish, can chip on edges over time.
- Thermofoil: low cost, but can peel near heat sources.
- Wood veneer or solid wood: warm look, needs care around the sink and dishwasher.
Hardware
Soft-close hinges and full-extension drawer slides are standard in most mid-range lines today. Check the drawer slide weight rating for pot drawers. Ask whether the hardware has a manufacturer warranty, and who handles adjustments after install.
Countertop materials compared
Quartz is the most popular countertop in local kitchens because it is durable and low maintenance. Other materials suit different budgets and styles. The table compares installed cost and how each material lives day to day.
| Material | Typical installed cost per sq ft | Heat | Stains and care | Best for |
|---|---|---|---|---|
| Laminate | $25 to $60 | Poor; use trivets | Resists stains; seams can swell if wet | Tight budgets, rentals |
| Butcher block | $60 to $120 | Fair | Needs regular oiling; can scratch | Islands, warm look |
| Solid surface | $50 to $110 | Fair | Non-porous; scratches can be sanded out | Seamless sinks, simple style |
| Quartz | $70 to $150 | Fair; resin can mark under hot pans | Non-porous; no sealing | Most family kitchens |
| Granite | $60 to $150 | Very good | Seal periodically | Natural stone on a budget |
| Marble | $100 to $250 | Good | Etches with acids; needs sealing | Bakers, classic look |
| Porcelain or sintered slab | $90 to $200 | Excellent | Very stain resistant; chips on edges if hit | Modern kitchens, thin profiles |
| Quartzite | $120 to $250 | Very good | Seal periodically; very hard | Natural stone look with durability |
What changes countertop cost
- Thickness and edge profile, such as mitred or waterfall edges.
- Number of seams and cut-outs for sinks, cooktops and outlets.
- Full-height slab backsplashes.
- Access to the kitchen for large slabs, such as narrow stairs or condo elevators.
Stone counters are templated after the cabinets are installed, then cut and installed in about 1 to 2 weeks. Plan for that gap in your kitchen renovation timeline.
After
Kitchen flooring options
Kitchen flooring has to handle water, dropped pans and heavy traffic. Decide early whether the floor runs under the cabinets or stops at them, because that affects how easily you can change the layout later.
- Porcelain tile: the most durable and water-resistant choice. Large-format tile needs a very flat subfloor. It is hard underfoot and cold without in-floor heat.
- Engineered hardwood: matches open-concept living areas. Handles some moisture better than solid hardwood, but standing water at the sink or dishwasher can damage it.
- Luxury vinyl plank: water-resistant, warm and lower cost. Choose a thick wear layer for kitchens.
- Solid hardwood: can be refinished many times, but reacts to spills and humidity changes.
Subfloor and transitions
Older houses in Hamilton and Waterloo Region often have uneven or springy floors. Levelling or adding a new subfloor before tile prevents cracked grout. In an open-concept kitchen, run one floor through the kitchen and living area to avoid awkward transitions.
If you are replacing floors across the main level, our whole-home renovation team can plan the kitchen and the rest of the floor together.
Kitchen lighting: pot lights, under-cabinet and pendants
Good kitchen lighting uses three layers: general light from above, task light on the counters and accent light for mood. Most older kitchens have one ceiling fixture, which casts your shadow onto the counter while you work.
The three layers
- Pot lights: slim LED pot lights placed in front of the upper cabinets, about 600 mm to 750 mm from the wall, so light lands on the counter edge.
- Under-cabinet lights: LED strips mounted at the front of the upper cabinets to light the counter directly.
- Pendants: over an island or peninsula, typically hung so the bottom sits around 750 mm to 900 mm above the counter.
Colour and control
- Choose one colour temperature throughout, usually 3000 K for a warm white or 3500 K to 4000 K for a brighter look.
- Look for a colour rendering index (CRI) of 90 or higher so food and finishes look natural.
- Put each layer on its own dimmer.
All new wiring needs an ESA permit and should be done by a licensed electrical contractor. The ESA explains why on its hire a licensed contractor page. Our electrical team handles kitchen circuits and lighting.
Kitchen ventilation and range hoods
A ducted range hood that vents outside is the best way to remove grease, moisture and cooking smells. Recirculating hoods only filter grease and odour and send the air back into the room. Plan the duct route early, because it affects cabinets, ceilings and the exterior wall.
Sizing a range hood
- Make the hood at least as wide as the cooktop. Slightly wider is better, especially on islands.
- Island hoods need more capacity than wall hoods, because there is no wall to guide the smoke.
- Gas ranges produce more heat and moisture than induction, so they usually need a stronger hood.
- Follow the manufacturer's mounting height and duct size. Undersized ducts make hoods loud and weak.
Make-up air
Powerful hoods pull a lot of air out of the house. In tight, well-sealed homes, that can depressurize the house and affect fuel-burning appliances such as a gas furnace or water heater. Your HVAC designer checks the hood size against the house and the Building Code and adds make-up air if needed.
Duct routing
The shortest, straightest duct works best. Each elbow reduces airflow. Exterior wall caps should have a backdraft damper, and ducts in unheated spaces need insulation to stop condensation dripping back into the hood.
Choosing kitchen appliances
Choose appliances before the cabinet drawings are final. Cabinet sizes, electrical circuits and gas lines all depend on the exact models you pick.
Standard sizes
- Ranges and cooktops: usually 760 mm (30 in) or 910 mm (36 in) wide; pro-style units go wider.
- Fridges: commonly 760 mm to 910 mm wide; counter-depth models look built in.
- Dishwashers: typically 610 mm (24 in) wide.
Power and gas
Induction cooktops and electric ranges need a dedicated high-amp circuit, which an older panel may not have room for. Gas ranges need a gas line installed by a licensed gas fitter. Wall ovens, microwaves, dishwashers and fridges often need their own circuits too.
Panel-ready and built-in appliances
Panel-ready fridges and dishwashers take a cabinet door on the front for a seamless look. They cost more and need precise cabinet sizing.
Tip: Order appliances early and have them delivered before cabinet installation. Installers need the real units, or at least the final spec sheets, to set openings correctly.
Open-concept kitchens: wall removal and permits
Opening a kitchen to the living or dining room is one of the most requested changes in older homes. The key question is whether the wall is load-bearing. If it supports floor joists or a roof above, it needs a beam and posts to carry the load down to the foundation.
How wall removal works
- A site visit and, where needed, a structural engineer confirm what the wall carries.
- The engineer designs the beam, posts and any new footing.
- Drawings go to the city for a building permit.
- Temporary walls hold up the structure while the wall comes out.
- The beam is installed, either below the ceiling (dropped) or within the floor (flush).
- Ducts, pipes and wires in the wall are rerouted, then the ceiling and floor are patched.
Removing a non-load-bearing wall often costs $2,000 to $6,000 with patching. A load-bearing wall typically runs $8,000 to $25,000 or more, including engineering, the beam, the permit and finishing. A flush beam or a wall full of ducts and plumbing costs more.
When you need a permit for a kitchen renovation
- Usually needed: structural changes, new or moved plumbing and drains, and new ductwork in some cities. Hamilton lists new or replacement ductwork, and Kitchener lists re-insulating walls, which can come up when you open an exterior wall.
- ESA permit: for new or changed wiring.
- Usually not needed: replacing cabinets, counters and fixtures in the same places. Kitchener also exempts removing a non-load-bearing wall in a house.
Rules vary by city, so check before you start. Kitchener charges $95 for a load-bearing wall removal permit plus a $250 fee that is refunded after the final inspection, and Hamilton charges $4.06 per m² for alterations to finished areas where no building systems change, with a $291 minimum. Kitchener's when you need a permit page and Hamilton's permit requirements page list what each city needs, and our building permits guide covers Hamilton, Brampton, Kitchener and Cambridge. In a condo, you also need the corporation's approval. Our design and permit service handles engineering and applications, and our structural team installs the beam.
After
Kitchen renovation timeline, step by step
A full kitchen renovation usually takes 8 to 18 weeks from first meeting to finished kitchen. Only 4 to 8 weeks of that is construction. The rest is design, selections, ordering and permits, which happen while your old kitchen still works.
| Step | Typical duration | What happens |
|---|---|---|
| 1. Site visit and budget | 1 week | Measure, discuss goals, set the tier |
| 2. Design and selections | 2 to 4 weeks | Layout, cabinet drawings, appliances, counters, tile, lighting |
| 3. Permits (if needed) | 2 to 6 weeks | Engineering and city review for structure or plumbing |
| 4. Cabinet production | 3 to 8 weeks | Starts after drawings are signed |
| 5. Demolition | 2 to 4 days | Remove cabinets, counters, flooring, and walls if planned |
| 6. Rough-ins and inspections | 1 to 2 weeks | Plumbing, electrical, gas, ducts, structural work |
| 7. Drywall and paint primer | 1 week | Patching, taping, priming |
| 8. Flooring | 2 to 5 days | Before or after cabinets, depending on the plan |
| 9. Cabinet installation | 2 to 5 days | Boxes, panels, hardware |
| 10. Countertop template and install | 1 to 2 weeks | Template after cabinets, then fabrication and install |
| 11. Backsplash, fixtures and appliances | 1 week | Tile, sink, faucet, lights, appliance hook-ups |
| 12. Final paint, touch-ups and inspections | 2 to 5 days | Deficiency list and final walk-through |
These are typical ranges. Late decisions and back-ordered items cause most delays, so finalize every selection before demolition starts.
Living through a kitchen renovation
You can usually stay in your home during a kitchen renovation, but you will be without a working kitchen for several weeks. A little planning makes it much easier.
Set up a temporary kitchen
- Move the fridge, microwave, kettle and toaster oven to a dining room, basement or garage.
- Use a laundry tub or bathroom sink for washing up.
- Add an induction hot plate or electric pressure cooker for simple meals.
- Stock disposable plates and plan a few takeout nights.
Dust, noise and access
Demolition and drywall sanding are the dustiest stages. We seal doorways with zip walls, cover floors and returns, and set up a clear path for trades. Expect noise during working hours and short shut-offs of water, power or gas.
Kids, pets and schedules
Keep children and pets away from the work area, because tools, open walls and nails are hazards. Ask for a weekly schedule so you know which days are loud and when inspectors or deliveries are coming.
Kitchen renovation mistakes to avoid
Most kitchen problems start in planning, long before the first cabinet arrives. These are the mistakes we see most often in kitchens and how to avoid them.
- Too little landing space. Leave at least 380 mm to 450 mm of counter beside the fridge, range and sink.
- Tight aisles. Islands squeezed into small rooms block dishwasher and oven doors.
- No plan for outlets. Map where you will use the mixer, coffee maker and chargers, and add outlets in the island where allowed.
- Recirculating hood by default. If you can duct outside, do it.
- Choosing finishes after demolition. Late choices are the most common cause of delays.
- Ignoring the rest of the house. Match flooring, trim and lighting with nearby rooms in an open plan.
- Skipping permits on structural or plumbing work. Unpermitted work can cause problems with insurance and resale.
- Underfunding the contingency. Keep 10 to 15% aside for what you find behind the walls.
- Comparing unlike quotes. Ask each contractor to price the same drawings, cabinet line and allowances.
Questions to ask your kitchen contractor
- Who designs the kitchen, and do I get cabinet drawings before I sign?
- What is included for electrical, plumbing and patching?
- Can you provide a WSIB clearance certificate?
- How do you handle change orders and hidden problems?
Planning a second kitchen downstairs? Our basement finishing cost guide prices basement kitchens. If you are also updating a bathroom, doing both together can save on trades and disruption. See our bathroom renovations, browse our projects, read our FAQ, or request a free kitchen quote.
Frequently asked questions
How much does a kitchen renovation cost in Hamilton?
Typically $15,000 to $40,000 for a refresh, $40,000 to $75,000 for a mid-range full renovation and $75,000 to $150,000 or more for a custom kitchen with layout changes. Costs in Brampton and Kitchener-Waterloo are similar. We give an exact price after a site visit.
How long does a kitchen renovation take?
Most full renovations take 4 to 8 weeks on site, plus 4 to 10 weeks before that for design, ordering cabinets and any permits.
Do I need a permit for a kitchen renovation in Ontario?
You usually need a building permit for structural changes and new or moved plumbing, and an ESA permit for new wiring. Replacing cabinets and counters in the same places usually does not need a building permit. Rules vary by city.
Is quartz or granite better for a kitchen?
Quartz needs no sealing and resists stains, which suits most families. Granite handles heat better and needs occasional sealing. Both cost about the same installed.
Can I keep my layout and just replace cabinets?
Yes, and it is one of the best ways to save. Keeping the sink, range and fridge in place avoids most plumbing, gas and electrical changes.
How much does it cost to remove a kitchen wall?
A non-load-bearing wall often costs $2,000 to $6,000 with patching. A load-bearing wall typically costs $8,000 to $25,000 or more with engineering, a beam and a permit.
What is the best kitchen layout for a small space?
A galley or L-shape usually works best. A peninsula can add seating and storage where an island will not fit.
Should I reface or replace my kitchen cabinets?
Reface if the boxes are solid, dry and the layout works. Replace if you want a new layout, more storage or the boxes are damaged.
Sources
- City of Hamilton: Building permit application requirements
- City of Hamilton: Building permit fees
- City of Kitchener: When you need a building permit
- City of Kitchener: Residential building permits
- City of Brampton: When a permit is not required
- City of Cambridge: Building permits
- Ontario Building Code
- ESA: Hire a licensed electrical contractor
- WSIB clearance certificate FAQ
This guide is general information for homeowners in Ontario, not legal or engineering advice. Rules and prices change and vary by city; confirm details for your property before you start.