Building Permits for Renovations in Hamilton, Brampton, Kitchener and Cambridge

In Hamilton, Brampton, Kitchener and Cambridge you need a building permit for structural changes, additions, new or enlarged openings, new or moved plumbing, basement apartments, underpinning and most decks, while painting, cabinets, counters and same-size window and fixture swaps usually do not. Each city reviews drawings from a qualified designer, charges fees based on the work, and inspects at set stages before closing the permit.

Updated · 14 min read · By The Smart Renovations Inc.

Key takeaways

  • Ontario's Building Code Act requires a permit to build, renovate, demolish or change the use of a building, and Hamilton, Brampton, Kitchener and Cambridge each publish their own list of exempt work.
  • Permit drawings must come from the homeowner (for their own house), a BCIN-qualified designer, an architect or a professional engineer; structural work usually needs an engineer.
  • Ontario sets a 10 business day target to decide a complete permit application for a house, but correction rounds often stretch the real timeline to several weeks.
  • If your plans break a zoning rule, you need a minor variance from the city's Committee of Adjustment before the permit can be issued, which typically adds two to four months.
  • Electrical work needs a separate notification and inspection through the Electrical Safety Authority (ESA), on top of the city building permit.
  • Building without a permit can bring orders to uncover or remove work, fines and trouble with insurance and resale.

When you need a building permit in Ontario

Ontario's Building Code Act requires a permit before you construct, renovate, demolish or change the use of a building. It also covers new buildings over 10 m², excavation and foundation work, and on-site septic systems. The Ontario Building Code sets the technical rules, and your city's building department issues permits and inspects the work.

What decides it is the type of work. A small job that removes a load-bearing wall needs a permit. An expensive kitchen that keeps the same layout and plumbing locations may not. The work also has to meet zoning even when no permit is needed, so a fence, shed or driveway can still break a by-law.

Each city issues its own permits. Stoney Creek permits come from the City of Hamilton, and Kitchener and Cambridge each run their own building division within the Region of Waterloo. If you are unsure, ask before you start. Every building department answers "do I need a permit" questions by phone or email, and our drawings and permits team can tell you on a site visit.

What needs a permit and what does not

All four cities publish lists of common projects. They mostly agree, with a few differences.

ProjectUsually needs a permitUsually does notWhere cities differ
WallsRemoving load-bearing walls, columns or beamsPainting, trim, millwork, cabinetsHamilton and Cambridge list adding or removing walls; Kitchener exempts removing a non-load-bearing wall in a house
Windows and doorsNew or enlarged openingsSame-size replacement with no structural changeAll four agree
BasementFinishing a basement, a new unit, underpinning, new plumbingPainting and decorating; damp-proofing in BramptonHamilton lists backwater valves and sump pumps as permit work
Kitchens and bathroomsAdding or moving plumbing fixtures or drainsReplacing fixtures, cabinets and counters in the same placeAll four agree
Heating and coolingNew or changed ductwork; changing the heating sourceReplacing a furnaceHamilton lists new or replacement ductwork; Brampton and Cambridge exempt air conditioning added to an existing forced-air system
DecksOver 600 mm (24 in) above gradeLow, freestanding decksHamilton requires a permit for any attached deck and for detached decks over 10 m²
Sheds and accessory buildingsOver 15 m², more than one storey, or with plumbingOne-storey storage shed 15 m² or less, no plumbingGarages and other non-shed structures need a permit from 10 m² (108 sq ft) in Kitchener and Cambridge
RoofingStructural changes, solar panelsRe-shingling with no structural workHamilton needs a permit to re-roof in a different material; Kitchener needs one for solar panels of 5 m² or more
Fireplaces and stovesWood stoves and wood-burning fireplacesGas fireplace in KitchenerCheck gas fireplaces elsewhere
Retaining wallsOver about 1 m high, depending on locationUnder 1 m in BramptonKitchener's threshold is 3 ft 3 in
Additions and porchesAlwaysNoneAll four agree

Kitchener also lists re-insulating walls, ceilings or floors as permit work. Read the full wording on Hamilton's permit requirements page, Brampton's permit list, Kitchener's when you need a permit page and Cambridge's building permits page.

Check zoning before you draw anything

Zoning decides what you can build on your lot: height, setbacks from property lines, lot coverage, floor area and how many units. The building permit examiner checks zoning as part of every review. If the drawings break a zoning rule, the permit stops until you change the design or get a minor variance.

Start with the zoning map for your address and a current survey. Your designer should prepare a zoning chart that lists each rule, what the by-law allows and what you propose. Additions, garden suites, rear decks, front porches and second-storey additions are the projects most likely to run into setback, height or coverage limits. Brampton adds Mature Neighbourhood rules in older areas, and Hamilton offers a paid zoning compliance review before you apply.

Unit limits differ too. Kitchener allows up to four units on most lots that permit a house, while Brampton and Cambridge cap a lot at three units in total. Hamilton allows additional dwelling units, with up to four units in some zones. See our guide to legal basement apartments in Ontario for the details.

Some lots carry extra layers. Lots near creeks and floodplains may need a conservation authority permit, such as from Credit Valley Conservation in Brampton or the Grand River Conservation Authority in Kitchener and Cambridge; parts of Hamilton also need Niagara Escarpment Commission approval. Heritage houses need heritage review. Cambridge requires a permit to remove or injure a private tree 20 cm or more in diameter, and tree rules elsewhere vary.

Who can prepare permit drawings: BCIN designers, architects and engineers

The Building Code sets out who may design work submitted for a permit. For a house, you have four options.

  • The homeowner. You can prepare drawings for your own house if you take responsibility for the design. It saves fees, but rejected drawings cost time.
  • A BCIN-qualified designer. These designers pass provincial Building Code exams and register with the Ministry of Municipal Affairs and Housing, which issues a Building Code Identification Number (BCIN). For houses, look for the "House" category; separate categories cover HVAC, plumbing and small buildings. Designers who are not architects or engineers file a Schedule 1 designer form with the application.
  • An architect. Licensed by the Ontario Association of Architects. Common on custom homes and larger multiplexes.
  • A professional engineer. Licensed by Professional Engineers Ontario. Structural work such as beams that carry a floor, new openings in bearing walls, underpinning and retaining walls usually needs an engineer's seal.

Many projects use a team: a BCIN designer for architectural drawings, an engineer for structure and a BCIN HVAC designer for heat loss and duct design. Kitchener requires a designer or architect for buildings with three or more units. Make sure every sheet shows the designer's name, registration number and signature, because missing stamps are a common reason applications are sent back.

Wood framing and sheathing of a three-storey custom home
Wood framing and sheathing of a three-storey custom home

Drawings and documents a permit application needs

A complete application moves faster than a quick one. All four cities want PDFs drawn to scale, fully dimensioned, and signed and dated. Hamilton asks for vector PDFs that are not password protected, with layers flattened and markups removed.

A typical residential application includes:

  • Application form (the provincial Application for a Permit to Construct or Demolish) and Schedule 1 designer information.
  • Site plan based on a current survey, showing property lines, setbacks, easements, building footprint and a zoning summary.
  • Floor plans for existing and proposed layouts, with smoke and carbon monoxide alarm locations.
  • Elevations for any exterior change, showing windows, doors and grades.
  • Sections and details for walls, floors, roofs, stairs, guards and fire separations.
  • Structural drawings and engineer forms where an engineer designed part of the work.
  • HVAC design, such as heat loss and duct layout, for new or modified systems.
  • Energy efficiency compliance for additions and new homes.
  • Plumbing information, such as a plumbing data sheet for new fixtures or drains.
  • City-specific forms. Hamilton requires an Applicable Law Checklist on every application and, for some residential projects, a sealed grading plan with a lot grading deposit. Brampton requires a legible legal survey signed by the surveyor for additional unit permits.

Each city posts project checklists; Brampton's homeowner permits page links packages for decks, basement finishes and additional units.

The building permit application process, step by step

  1. Scope and site visit. Decide what you want to build and confirm the existing structure, services and constraints.
  2. Survey and zoning check. Order a survey if you do not have a usable one, then confirm zoning compliance.
  3. Drawings and engineering. The designer prepares permit drawings; the engineer designs structural items.
  4. Online submission and fee. Hamilton uses its Customer Portal through my.hamilton.ca, Brampton the Building and Business Portal, Kitchener its online services portal, and Cambridge its City Application Portal. Hamilton wants the fee paid in full at submission; Cambridge invoices it after an initial review.
  5. Intake check. Staff confirm the application is complete. Missing documents send it back before review starts.
  6. Zoning and Building Code review. Examiners review the drawings and issue comments if anything needs to change.
  7. Resubmission. The designer revises drawings and responds to each comment.
  8. Permit issued. Pay any balance, then post the permit on site where inspectors can see it.
  9. Construction and inspections. Book each required inspection and do not cover work until it passes.
  10. Final inspection and closing. The permit is closed once all inspections pass.

The homeowner or the contractor can be the applicant. Either way, the owner should see the drawings before they go in. Changes are cheapest on paper.

How long permit review takes in Hamilton, Brampton, Kitchener and Cambridge

The Building Code sets time limits for a city to issue or refuse a complete application. For a house the limit is 10 business days. Larger and more complex buildings get longer periods, up to 30 days for complex buildings such as hospitals. The clock starts only when the application is complete, and the city must give all reasons if it refuses.

Kitchener and Brampton both state a 10 business day first review for standard residential applications, and Kitchener notes there is no legislated timeframe for later reviews. Hamilton and Cambridge do not post review times, so ask when you apply.

Typical real-world ranges for complete, well-prepared applications:

  • Interior alterations, decks, basement entrances: about 2 to 6 weeks.
  • Basement apartments and underpinning: about 4 to 10 weeks.
  • Additions and second storeys: about 6 to 12 weeks, longer if a minor variance is needed.
  • New custom homes and multiplexes: often 2 to 6 months including zoning work.

These are typical ranges and can change. Workload at the city, the season and how complete your drawings are all change the result. If you are planning a new house, our guide on the custom home building process covers the longer approval path.

Formwork, rebar and waterproofing for a new walk-out basement entrance
Formwork, rebar and waterproofing for a new walk-out basement entrance

Building permit fees in Hamilton, Brampton, Kitchener and Cambridge

Permit fees are set by each city's by-law and are usually reviewed every year. Most cities charge by floor area with a minimum fee, plus flat fees for common projects. For most house renovations, the permit fee is a small share of the budget; drawings and engineering usually cost more.

City and itemCurrent fee
Hamilton, minimum fee$291
Hamilton, new detached, semi or row house$18.32 per m²
Hamilton, finishing a basement or renovating finished areas$4.06 per m²
Hamilton, additional dwelling unit in an existing house$515 flat; $1,030 for a detached unit in the rear yard
Brampton, new custom house$17.80 per m² (minimum $2,004.10)
Brampton, stand-alone basement finish or deck$326.21 flat
Brampton, second unit$1,186.24 permit fee plus $200 registration
Kitchener, interior alterations or basement finishing$0.37 per sq ft (minimum $95) plus a $250 refundable fee
Kitchener, new house or addition$1.07 per sq ft, plus a refundable fee
CambridgeInvoiced after the City reviews your application

Kitchener refunds its rebate fees once the final inspection passes. Hamilton has proposed a 3% fee increase, with a public meeting set for December 1, 2026, so recheck before you budget. As a rough guide, permit fees for a typical basement, kitchen or bathroom renovation that needs a permit run from a few hundred dollars to about $3,000, and additions and new homes run higher. Other costs can include a survey ($1,000 to $3,000), drawings ($2,000 to $10,000), engineering ($1,000 to $8,000) and, for new homes, development charges. These are typical ranges; we confirm exact amounts during design. Check current figures on Hamilton's building permit fees page, Brampton's permit fee schedule and Kitchener's residential permits page.

Building inspections: what gets inspected and when

Every permit lists the inspections required. The permit holder books each one, and Ontario requires the inspector to attend within two business days of a request. Work must stay uncovered until the inspector passes it.

Common inspection stages for a house renovation:

  • Excavation and footings before concrete is poured.
  • Foundation and backfill, including damp-proofing and drainage.
  • Underground plumbing and building drains before the slab or trench is closed.
  • Framing and structure, including beams, posts, stairs and fire blocking.
  • Rough plumbing and HVAC before walls are closed.
  • Air barrier, insulation and vapour barrier before drywall.
  • Fire separation for second units, before finishes cover it.
  • Occupancy, grading and final, including guards, handrails, smoke and CO alarms, and exterior grading.

Hamilton takes requests by phone, email or its Customer Portal, and Brampton and Kitchener book online. Cambridge asks you to call the inspector at least 24 hours ahead and charges a $100 re-inspection fee if work is not ready. Brampton charges $118.61 for a recall inspection on additional unit permits after two failed inspections. See Hamilton's building inspections page for its full list of stages. Keep the stamped drawings on site; inspectors check the work against them, and any change needs a revision first.

Minor variances and the Committee of Adjustment

When a design breaks a zoning rule by a small amount, you can apply to your city's Committee of Adjustment for a minor variance. Common examples are a rear addition a little deeper than allowed, a side setback a few centimetres short, or a garage or porch slightly over the coverage limit.

Under Ontario's Planning Act, the variance must be minor, desirable for the appropriate use of the land, and keep the general intent of the official plan and zoning by-law. The process usually runs like this:

  1. Your designer prepares drawings and a list of the variances in exact metric measurements, often confirmed by a zoning review.
  2. You file the application online and pay the fee. Incomplete applications are not scheduled.
  3. The city mails notice to nearby owners, and you post a city-supplied sign on the property.
  4. A public hearing is held where you, neighbours and staff can speak. Hamilton sets a hearing within 30 days of submission; Cambridge meets about monthly.
  5. The committee issues a decision, often with conditions, followed by a 20-day appeal period to the Ontario Land Tribunal.
City2026 minor variance fee for a house
Hamilton$4,135; $745 for routine variances such as decks, sheds, porches and secondary units; $5,160 after the fact
Brampton$3,056 per variance up to $12,212; $12,212 flat for door, window, driveway, parking, additional unit or after-the-fact variances
Kitchener$1,800 for lots with four or fewer units
Cambridge$2,295

From filing to a final decision, two to four months is typical, and an appeal adds much more. Individual neighbours and community associations can no longer appeal a minor variance to the Tribunal; the applicant, the Minister and certain public bodies can. Talk to neighbours before the hearing anyway. Hamilton explains its process on its minor variance page, and Cambridge on its Committee of Adjustment page.

ESA electrical permits and other approvals

Electrical work is not covered by the city building permit. In Ontario, the Electrical Safety Authority (ESA) oversees electrical work, and a notification (often called an ESA permit) must be filed before the work starts. ESA then inspects the wiring and issues a certificate of acceptance when it passes.

Anyone paid to do electrical work must be a Licensed Electrical Contractor with an ECRA/ESA licence number, which you can check through ESA's licensed contractor search. Homeowners may do electrical work in their own home, but they must file the notification and meet the Ontario Electrical Safety Code. Our plumbing, electrical and HVAC team coordinates the electrical side with the building permit.

Other approvals that can apply to a renovation:

  • Plumbing and HVAC permits. Some cities issue these separately from the building permit, others include them.
  • Gas work by a licensed gas technician for new gas lines, furnaces and appliances.
  • Utility locates through Ontario One Call before any digging.
  • Driveway, curb cut and road occupancy permits if you widen a driveway or put a bin or materials on the street or boulevard.
  • Tree permits for work near protected private or city trees.
  • New home warranty and builder licensing. Builders of new homes, including knockdown rebuilds, must be licensed by the Home Construction Regulatory Authority, and most new homes are enrolled with Tarion. Renovations of existing homes are not covered by Tarion, although Hamilton notes that the warranty applies to new detached additional dwelling units.
Stucco base coat on a three-storey home, with scaffolding
Stucco base coat on a three-storey home, with scaffolding

What happens if you renovate without a permit

Building without a required permit is an offence under the Building Code Act. According to the Government of Ontario, an individual can be fined up to $50,000 for a first offence and up to $100,000 for later offences, and corporations face much higher maximums. Fines are only part of the cost.

  • Stop work and compliance orders. The city can stop the job and order you to apply for a permit after the fact.
  • Uncovering work. Inspectors may require drywall, flooring or concrete to be opened so they can see what is behind it, and work that fails must be redone.
  • Insurance. Insurers may deny or reduce claims connected to unpermitted work, especially electrical and plumbing.
  • Selling the house. Buyers' lawyers check for open permits and work orders, and unpermitted work can delay a sale or reduce the price.
  • Safety. Permits exist so a second set of eyes checks structure, fire separations, exits and venting.

If you bought a house with unpermitted work, you can usually apply for a permit for the existing work. Expect to open some finishes for inspection. Our guide to legalizing a basement apartment walks through this for second units, and Brampton also requires second and third units to be registered with the City.

Tips to avoid permit delays

Most delays come from incomplete applications and slow responses to comments.

  • Get a current survey early. An old or missing survey is a common hold-up, and Brampton may reject an illegible or unsigned survey at submission.
  • Do a zoning chart before design is final. Catch variance issues before you pay for full drawings.
  • Use the city's checklist. Every project guide lists required drawings and forms; tick each one off.
  • Get every sheet signed and stamped. Missing BCIN numbers, engineer seals or Schedule 1 forms send applications back.
  • Answer comments in one complete resubmission. Partial answers restart the cycle.
  • Book long-lead items after issue, not before. Changes during review can alter window sizes or beam specs.
  • Keep the permit active. A chief building official may revoke a permit if work does not start within six months of issue or is suspended for more than a year.
  • Check your contractor's paperwork. Hamilton requires contractors to hold a valid Trade and Contractor Licence and asks for the number on the application. Ask any contractor for a WSIB clearance certificate before work starts.

Tip: In Hamilton, a zoning compliance review costs $520 and tells you about zoning problems before you spend on full drawings. Ask the other cities whether they offer a similar pre-application check.

How permits fit into your renovation

Permits shape the order of the whole job. Drawings and approval come first, then demolition and structure, then inspections at each stage before finishes. When we plan a project, we build the permit and inspection steps into the schedule so trades are not waiting on paperwork.

Different projects carry different permit loads. A kitchen renovation that moves plumbing or removes a wall needs a permit, while a cosmetic refresh usually does not; see our kitchen renovation guide. Additions and new homes carry the most zoning and engineering work. Basement projects often involve underpinning or a bench footing and, for rental units, the rules for a legal basement apartment.

Not sure whether your project needs a permit? Request a free quote and we will look at the work, tell you which approvals apply and handle the application through our design and permits service.

Frequently asked questions

Do I need a permit to finish my basement in Hamilton?

Yes. Hamilton lists finishing a basement as permit work, and so do Brampton and Kitchener. Hamilton charges $4.06 per m², with a $291 minimum.

Do I need a permit to renovate a kitchen or bathroom?

Replacing cabinets, counters and fixtures in the same place usually does not. Moving or adding plumbing, removing load-bearing walls or adding new openings does.

Do I need a permit for a deck?

In Brampton and Kitchener, decks more than about 600 mm (24 in) above the ground need a permit. Hamilton requires a permit for any deck attached to the house and for detached decks over 10 m². Every deck still has to meet zoning setbacks.

Can my contractor apply for the permit?

Yes. The owner or an authorized agent such as the contractor or designer can apply. The owner should review the drawings, and the permit should be in place before work starts.

How long is a building permit valid in Ontario?

A permit can be revoked if work does not start within six months of issue or stops for more than a year. If you need more time, talk to the building department before that happens.

What is a BCIN designer?

A designer who has passed Ontario's Building Code exams and is registered with the province, shown by a Building Code Identification Number. For house projects, look for the "House" qualification.

Do I need a separate permit for electrical work?

Yes. Electrical work needs a notification filed with the Electrical Safety Authority and an ESA inspection, separate from the city building permit.

What if my renovation breaks a zoning rule?

You can redesign to comply or apply to the Committee of Adjustment for a minor variance. The permit cannot be issued until the variance is approved and the appeal period ends.

Sources

This guide is general information for homeowners in Ontario, not legal or engineering advice. Rules and prices change and vary by city; confirm details for your property before you start.